My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0604
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:35:17 AM
Creation date
5/30/2024 8:32:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br />desist, cleanup, abatement, and, if applicable, removal of illicit connection. In addition, it adds <br />language to clearly state if the City performs the cleanup and abatement work, the City can <br />seek cost recovery and has the authority to inspect any premises, parcel, or mobile business <br />operating within the city. <br /> <br />Section 9.14.120 – Updates and adds language for implementing best management practices <br />to prevent waste and pollutants from entering the City’s storm drain system through the various <br />ways they can enter the storm system, including notification to the City for known or suspected <br />release of pollutants. <br /> <br />Section 9.14.130 – Updates site management requirements pertaining to public and private <br />construction sites and activities, clarifying City and site obligations to implement effective <br />erosion control, run-on and runoff control, sediment control, active treatment systems (as <br />appropriate), good site management, and non-stormwater management through all phases of <br />construction. <br /> <br />Section 9.14.140 – Updates development and design requirements pertaining to new and <br />redevelopment projects, clarifying City and permit applicant obligations to implement source <br />control, site design, and stormwater treatment measures. <br /> <br />Section 9.14.150 – Adds trash load control measures and actions to reduce trash impacts on <br />the city’s storm drain system and waterways, including those from illicit discharges, illegal <br />dumping, existing development, and new/redevelopment. <br /> <br />Section 9.14.160 – Adds language into the chapter to provide transparency regarding MRP <br />obligations for new and redevelopment projects entering into maintenance agreements for the <br />long-term maintenance of the stormwater treatment measures. <br /> <br />Section 9.14.170 – Updates language related to the City’s authority to inspect and sample to <br />ensure MRP compliance, as well as require those responsible for violations to take appropriate <br />follow-up action to prevent the discharge of pollutants including the implementation of <br />appropriate BMPs and/or installation of full trash capture systems/devices. <br /> <br />Section 9.14.180 – Minor editorial modification and deletion of prior provision language for <br />consolidation. <br /> <br />Section 9.14.190 - 9.14.220 – Mainly provision renumbering adjustments with minor editorial <br />modifications. <br /> <br />Section 9.14.230 – Language added and deleted to update proper enforcement for violations <br />deemed a public nuisance and minor editorial changes. <br /> <br />Section 9.14.250 – Minor editorial adjustments and addition of cost recovery for any applicable <br />attorney’s fees for any violation enforced by civil action. <br /> <br />Section 9.14.260 – Updates related to the City’s enforcement authority, expanded to include: <br />verbal/written warning, stop work order, withholding plan approvals or permits, and parameters <br />for administrative cost recovery against violators. <br /> <br />Page 276 of 428
The URL can be used to link to this page
Your browser does not support the video tag.