Laserfiche WebLink
B.No construction activity may commence until adequate BMPs have been installed conforming to <br />MRP Provision C.6 Construction Site Control requirements and the authorized enforcement official <br />has been notified of their completion. <br />C.The authorized enforcement official shall have the authority to inspect construction activities within <br />the City of Pleasanton pursuant to Sections 9.14.170 - 9.14.280. <br />D.When any work is being performed contrary to the provisions of this section, the authorized <br />enforcement official may order the work stopped by notice in writing served on any Persons engaged <br />in doing or causing the work to be done. Such work shall stop until the authorized enforcement <br />official authorizes the work to proceed. This remedy is in addition to and does not supersede or limit <br />any and all other remedies, both civil and criminal, provided in Sections 9.14.170 - 9.14.280 of the <br />City of Pleasanton Municipal Code. <br />§ 9.14.140 Development Requirements <br />Development projects shall conform to the MRP Provision C.3 New and Redevelopment Standards. <br />A.Stormwater Source Controls. Source controls as described in the MRP and in further detail in the <br />Pleasanton Standard Specification Section 5 are required for all development projects doing work in <br />the City of Pleasanton. <br />1.Architectural Copper. Copper metal roofing, copper granule containing asphalt shingles, <br />copper gutters, copper flashing, and copper architectural ornaments shall not be permitted for <br />use on any residential, commercial, or industrial building for which a building permit is <br />required. Replacement roofing and gutters on historic structures are exempt, provided that the <br />roofing material used shall be pre-patinated at the factory. For the purposes of this exemption, <br />the definition of “historic” shall be as identified in the City of Pleasanton’s Downtown <br />Specific Plan. <br />B.Site design techniques. Development projects that fall into the applicable thresholds as defined in the <br />MRP shall incorporate at least one of the following site design techniques, as applicable to the <br />project: <br />1.Direct roof runoff into cisterns or rain barrels for use. <br />2.Direct roof runoff onto vegetated areas through disconnected roof leaders that are properly <br />located to prevent erosion of landscaped materials. <br />3.Direct runoff from sidewalks, walkways, patios, driveways, uncovered parking onto vegetated <br />areas. <br />4.Construct sidewalks, walkways, patios, driveways, uncovered parking, or bike lanes with <br />permeable surfaces as defined in the MRP. <br />Applicants for these projects shall select, design, and construct these site design measures, as <br />applicable, with the requirements and guidelines set forth in the most current version of <br />following documents: <br />1. MRP <br />2. C.3 Technical Guidance Manual <br />Page 293 of 428