My WebLink
|
Help
|
About
|
Sign Out
AMENDED AGENDA PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
06-12
>
AMENDED AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 10:58:18 AM
Creation date
6/17/2024 10:56:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PUD-18-07M Planning Commission <br />Page 3 of 16 <br /> <br />14. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit submittal. <br />The plan shall include photometric contours, manufacturer’s specifications on the fixtures, and <br />mounting heights. All exterior lighting including landscape lighting shall be directed downward and <br />designed or shielded so as to not shine onto neighboring properties or streets. The photometrics <br />shall be reviewed and approved by the City Traffic Engineer and Director of Community <br />Development prior to building permit issuance. The type and location of all exterior light fixtures <br />shall be reviewed and approved by the Director of Community Development prior to building <br />permit issuance. <br /> <br />15. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br />site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br />plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br />development plan shall include all required information to design and construct site, grading, <br />paving, drainage, and utilities. <br /> <br />16. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br />prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br />Official and Director of Community Development certifying the pad elevations and building <br />locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br />inspection for the structures. <br /> <br />17. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification <br />prepared by a California-licensed land surveyor or civil engineer to the Director of Community <br />Development before the first framing or structural inspection by the Building and Safety Division. <br />The height of the structures shall be surveyed and verified as being in conformance to the <br />approved building heights as shown on Exhibit B or as otherwise conditioned. <br /> <br />18. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> <br />19. TRANSFORMERS: New electrical transformers shall be placed underground, or aboveground <br />and screened from view to the satisfaction of the Director of Community Development. Details of <br />the new electrical transformers, and any screening architecturally compatible with the building, <br />shall be included in the building permit submittal and shall be subject to the review and approval <br />of the Director of Engineering/City Engineer and Director of Community Development prior to <br />building permit issuance. <br /> <br />20. MECHANICAL EQUIPMENT – SCREENING: The applicant shall effectively screen from view all <br />ducts, meters, air conditioning equipment, and any other mechanical equipment, whether on the <br />structure, on the ground, or on the roof, with materials architecturally compatible with the building. <br />Screening details shall be shown on the plans submitted for building permit, the adequacy of <br />which shall be determined by the Director of Community Development. All required screening <br />shall be installed prior to final occupancy. <br /> <br />21. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained completely within <br />enclosures. Containers shall be stored within the enclosures at all times except when being <br />unloaded. The enclosures shall be sized to accommodate trash, recycling, and green waste <br />containers in compliance with the Alameda County Mandatory Recycling Ordinance. The <br />materials and colors of any new enclosures shall match or be compatible with the primary <br />building on site and the gates shall be metal or solid wood unless otherwise approved by the <br />Director of Community Development. Elevation drawings and plan details, including color and <br />material of the enclosures noted, shall be included in the building permit submittal and shall be
The URL can be used to link to this page
Your browser does not support the video tag.