Laserfiche WebLink
Ordinance No. 2281 <br />Page 23 of 32 <br />MS4. Applicants for development projects shall select, design, and construct <br />full trash capture systems or devices, as applicable, to the satisfaction of the <br />[City of Pleasanton] in accordance with the requirements and guidelines set <br />forth in the most current version of following documents: <br />a. MRP <br />b. C.3 Technical Guidance Manual <br />The above referenced documents, as amended and reissued from time to <br />time, are incorporated by reference into this chapter. These documents <br />shall be available for download at the Alameda Countywide Clean Water <br />Program website. <br />4.The Applicant must demonstrate to the satisfaction of the City of Pleasanton <br />that the trash control programs implemented in lieu of full trash capture <br />devices or systems will provide an equivalent level of trash load reduction to <br />installing full trash capture devices. Applicants for development projects shall <br />develop and submit a full trash capture equivalency plan to the City of <br />Pleasanton for approval. The plan must include the planned trash control <br />actions, projected trash reductions of the actions, implementation schedule, <br />entities responsible for implementing the actions, and the plan to inspect and <br />verify the effectiveness of the actions. <br />B. Maintenance access easements. <br />1. The Responsible Person must ensure access from the public right-of-way to <br />full trash capture systems or devices for the purpose of inspection, <br />maintenance, and repair by securing all the maintenance access easements <br />needed on a permanent basis. Such access shall be sufficient for all <br />necessary equipment materials and personnel. The maintenance access <br />easement must be located such that the stormwater treatment systems are <br />readily accessible for inspection purposes during regular working hours. <br />C. Operation and maintenance. Installed full capture trash systems or devices will <br />be operated and maintained by the Responsible Person for the life of the project, <br />following the manufacturer’s recommendations for maintenance. <br />D. Inspection of systems. The authorized enforcement official shall have the <br />authority to inspect the full trash capture system or device during construction <br />and life of the project pursuant to Sections 9.14.170 - 9.14.280. <br />E. Inadequacy of the system. <br />1.If a full trash capture system or device is found to be inadequate by virtue of <br />physical evidence of operational failure, even though it was built as called for <br />Page 221 of 248