Laserfiche WebLink
Tree Report. April 2023. HortScience, Inc. <br />Merritt Property, The Foothill Boulevard Holding Company. Page 28 <br /> <br /> <br />HortScience│Bartlett Consulting ● Divisions of The F.A. Bartlett Tree Expert Company <br /> <br />4. Fences are to remain until all site work has been completed. Fences may not be <br />relocated or removed without permission of the project superintendent. <br /> <br />5. Construction trailers, traffic and storage areas must remain outside fenced areas <br />at all times. <br /> <br />6. No materials, equipment, spoil, waste or wash-out water may be deposited, <br />stored, or parked within the TREE PROTECTION ZONE (fenced area). <br /> <br />7. Any additional tree pruning needed for clearance during construction must be <br />performed by a qualified arborist and not by construction personnel. <br /> <br />8. Any roots damaged during grading or construction shall be exposed to sound <br />tissue and cut cleanly with a saw. <br /> <br /> <br />HortScience | Bartlett Consulting <br /> James R. Clark, Ph.D. <br />ISA Certified Arborist WE-0846A <br />