December 21, 2022 <br /> Job No. 4031.101 <br /> Page 12 <br /> <br />BERLOGAR STEVENS & ASSOCIATES <br /> <br />To a degree, the performance of the proposed project is dependent on the procedures and quality <br />of the construction. Therefore, we should provide observations of the contractor's procedures, the <br />exposed soil conditions, and field and laboratory testing during site preparation and grading, <br />placement and compaction of fill, underground utility installation, and foundation and pavement <br />construction. These observations will allow us to check the contractor's work for conformance <br />with the intent of our recommendations and to observe any unanticipated soil conditions that could <br />require modification of our recommendations. <br /> <br />9. LIMITATIONS <br /> <br />The conclusions and recommendations presented in this report are based upon the project <br />information provided to us, information obtained from published geologic reports, subsurface <br />conditions encountered at the boring and test pit locations and professional judgment. Site <br />conditions described in this report are those existing at the times of our field explorations and are <br />not necessarily representative of such conditions at other locations or times. The boring and test <br />pit logs show subsurface conditions at the locations and on the dates indicated. It is not warranted <br />that they are representative of such conditions elsewhere or at other times. The locations of the <br />field explorations were estimated by pacing from existing surface features at the site; they should <br />be considered approximate only. <br /> <br />The information provided herein was developed for use by The DeSilva Group for the project as <br />described herein. In the event that changes in the nature, design or location of the proposed project <br />are planned, if subsurface conditions differ from those described in this report, or revisions are <br />made to the Building Code that are related to Geotechnical Engineering, the conclusions and <br />recommendations in this report shall be considered invalid, unless the changes are reviewed and <br />the conclusions and recommendations are confirmed or modified in writing by BSA. In light of <br />this, there is a practical limit to the usefulness of this report without critical review. Although the <br />time limit for this review is strictly arbitrary, it is suggested that two years from the date of this <br />report be considered a reasonable time for the usefulness of this report. <br /> <br />This geotechnical investigation has been conducted, and the opinions, conclusions and <br />recommendations presented in this report were developed, in accordance with accepted <br />geotechnical engineering practices that exist in the project area at the time this report was prepared. <br />No warranty, expressed or implied, is offered, inferred or made, by or through our performance of <br />professional services. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />