Laserfiche WebLink
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 155 <br />impacted structures. Upon approval by the City, the <br />construction vibration reduction measures shall be incorporated <br />into the construction documents. A note shall be provided on <br />grading and building plans indicating that, during grading and <br />construction, the property owner/developer shall be responsible <br />for requiring contractors, to be monitored via on-site inspection <br />by the Community Development Department, to implement <br />these measures to limit construction-related vibration impacts. <br />For any future development projects that would necessitate the <br />use of large vibratory rollers within 30 feet of an off-site structure, <br />or the use of heavy construction equipment (i.e., construction <br />equipment with a peak particle velocity [PPV] at 25 feet [inches <br />per second] rating of 0.051 or greater as shown in Table 3.11-3 in <br />Section 3.11, Noise, in this Program EIR) within 15 feet of an off- <br />site structure, the project sponsor shall retain a Noise Specialist to <br />prepare a Construction Vibration Reduction Plan for submittal to <br />the City’s Director of Community Development for review and <br />approval that identifies specific techniques, such as the depth <br />and location of temporary trenching, that would reduce <br />potential vibration impacts to less than significant for any <br />impacted structures. Upon approval by the City, the <br />construction vibration reduction measures shall be incorporated <br />into the construction documents. A note shall be provided on <br />grading and building plans indicating that, during grading and <br />construction, the property owner/developer shall be responsible <br />for requiring contractors, to be monitored via on-site inspection <br />by the Community Development Department, to implement <br />these measures to limit construction-related vibration impacts. <br />Mitigation Measures for the Proposed Project <br />MM NOI-1 has already been satisfied by the preparation of a site-specific <br />noise analysis, verifying that the proposed project would comply with the <br />requirements of the Municipal Code.