My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 169 <br />library facility to be developed as part of the Civic Center Master. However, <br />as stated above, no plans have been approved at this time. <br />As described above, the project-specific environmental impacts of <br />constructing new or expanded library facilities to support the growth <br />associated with the Housing Element Update cannot be determined at the <br />time of certification of the Housing Element Update FEIR because the site- <br />specific locations and designs of future new or expanded facilities are not <br />known. As the City proceeds with the construction of new or expanded <br />library facilities, those projects would be reviewed by the City for compliance <br />with the policies and programs of the General Plan and Municipal Code. <br />Furthermore, as the City receives development applications for development <br />consistent with the Housing Element Update, those applications would be <br />reviewed by the City for compliance with the policies and programs of the <br />General Plan to ensure that library facilities keep pace with new <br />development. In addition, development consistent with the Housing Element <br />Update would be required to pay capital facility fees in accordance with <br />Chapter 3.22. Therefore, future development consistent with the Housing <br />Element Update would not result in significant adverse effects related to <br />library facilities and impacts would be less than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed project would develop 110 new dwelling units, a recreation <br />center, and a mini park. The proposed project would also retain one existing <br />single-family residence and would result in the development of a trail <br />connection to the Marilyn Murphy Kane Trail. As a conservative assumption, <br />FCS assumes that all project residents would relocate from outside of the City, <br />and the proposed project would result in a population increase of <br />approximately 220 persons, based on the City Housing Manager’s estimate <br />for two persons per household in this senior age-restricted proposed project. <br />This increase in population can reasonably be expected to produce an <br />increase in demand for library services. <br />Although the proposed project would include more units for the project site <br />than analyzed and predicted within the Housing Element Update FEIR, the <br />smaller household size for the senior age-restricted project results in an <br />increase in the population growth that had been planned for by the City as <br />forecasted in the City’s Housing Element Update. For more details, please <br />refer to Section XIV, Population and Housing, above.
The URL can be used to link to this page
Your browser does not support the video tag.