Laserfiche WebLink
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />198 <br />Development consistent with the Housing Element Update, including <br />development within the SRA on Site 22 (Merritt), would not impair an <br />adopted emergency response plan or emergency evacuation plan during <br />construction or operation because policies and programs contained with the <br />General Plan establish requirements for preventive measures and practices <br />to minimize wildland fire hazards and maintain adequate evacuation and <br />access routes for vehicles in the event of an emergency. Development <br />consistent with the Housing Element Update would require continued <br />implementation of the Tri-Valley LHMP, the Comprehensive Emergency <br />Management Plan, and Chapters 19.36 and 20.24 of the Municipal Code, <br />and the California Fire Code. The LPFD would be included in the <br />development review process, so the City ensures adequate emergency <br />vehicle access and ensures that development is designed and operated in a <br />manner that minimizes fire hazards and maximizes the potential for <br />responsive emergency services. <br />Accordingly, the Housing Element Update FEIR concluded that compliance <br />with applicable federal, State, and local policies, as well as review of all new <br />structures by the Police and Fire Departments to ensure adequate <br />emergency access, would ensure that impacts are less than significant. <br />Proposed Project Analysis and Conclusion <br />The southern portion of the project site is within a Moderate FHSZ, while the <br />easternmost portion of the site is mapped as a VHFHSZ SRA as described in <br />the Housing Element Update FEIR. Furthermore, the northern portion of the <br />project site is mapped as a VHFHSZ LRA (Exhibit 7). As described in Section <br />XVII, Transportation, the proposed project would provide adequate access <br />for emergency vehicles. The proposed project is located along Foothill Road, <br />which is a major arterial street and would serve as an evacuation route to I- <br />580 and I-680 in the event of an emergency evacuation. Furthermore, the <br />proposed project would be required to implement a construction traffic <br />control/traffic management plan to ensure that construction activities do not <br />impair any emergency response plans or emergency evacuation plans. <br />The proposed project would be required to comply with applicable goals <br />and policies from the Public Safety Element of the General Plan. In addition, <br />the proposed project would also not interfere with guidelines set forth in the <br />Pleasanton Comprehensive Emergency Management Plan, Alameda <br />County Disaster Plan, the Tri-Valley LHMP, Chapters 19.36 and 20.24 of the <br />Municipal Code, and the California Fire Code. The proposed project would <br />undergo review by the LPFD to ensure adequate emergency access.