Laserfiche WebLink
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 209 <br />cumulative impacts. However, as indicated herein, the project is within the <br />cumulative scope analyzed in the Housing Element Update FEIR, and, <br />therefore, its contributions to the cumulative impacts were analyzed and <br />considered. Because the proposed project is consistent with the analyses of <br />the Housing Element Update FEIR as evidenced herein, it does not have any <br />features that would result in a cumulatively considerable contribution <br />different from what was disclosed and mitigated to the fullest extent possible <br />in the Housing Element Update FEIR. Additionally, the proposed project <br />would be consistent with the analysis contained within the Housing Element <br />Update FEIR with respect to cumulative VMT and water supply impacts <br />because, as discussed above, it would not create new impacts, increase <br />impacts, and there is no new information of substantial importance. <br />c) Adverse Effects on Human Beings? <br />Does the project: Have environmental effects, which will cause substantial adverse <br />effects on human beings, either directly or indirectly? <br />Summary of Housing Element Update FEIR <br />The Housing Element Update FEIR indicated that potentially significant <br />impacts would occur related to air quality, hazardous substances, and noise. <br />These impacts could cause substantial adverse effect on human beings. <br />However, the Housing Element Update FEIR included MM AIR-1a, MM AIR-1b, <br />MM HAZ-2, MM NOI-1, MM NOI-2, to ensure such impacts are reduced to less <br />than significant. <br />Proposed Project Analysis and Conclusion <br />The proposed project would be required to implement Housing Element <br />Update FEIR MM AIR-1a and MM AIR-1b. Furthermore, per General Plan <br />Program 2.2, the project applicant is required to incorporate all <br />recommendations provided in the Geotechnical Investigation. The proposed <br />project would not be required to implement MM HAZ-2, which requires <br />preparation of a Phase I ESA, because the proposed project is designated a <br />closed site by the RWQCB and has therefore already satisfied the <br />requirements of MM HAZ-2. Lastly, the proposed project would not be <br />required to implement MM NOI-1 and MM NOI-2 because impacts would be <br />less than significant without mitigation as detailed in Section XIII, Noise, <br />above. The requirements of MM NOI-1 have already been satisfied with the <br />preparation of a site-specific noise analysis. With the implementation of these <br />mitigation measures, there are no environmental effects that are peculiar to <br />the proposed project. The proposed project would not result in a new or