My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton 2023-2031 (6th Cycle) Housing Element Update <br />Introduction Draft Program EIR <br /> <br /> <br />1-10 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480022/EIR/3 - Draft/21480022 Sec01-00 Introduction.docx <br />Given the location of the City in the urbanized context of the San Francisco Bay Area and the lack of <br />mineral resources in the area, impacts to these resources are anticipated to be less than significant. <br />Chapter 5–Other CEQA Considerations <br />This chapter evaluates and describes the following CEQA required topics: significant and unavoidable <br />impacts, growth-inducing impacts, and significant irreversible environmental changes. <br />Chapter 6–Alternatives to the Housing Element Update <br />This chapter provides a comparative analysis of the Housing Element Update and the selected <br />alternatives, including the mandatory “No Project” alternative. State CEQA Guidelines Section <br />15126.6 requires that an EIR describe a range of reasonable alternatives to a proposed project, <br />which could feasibly attain the basic objectives of a project and avoid and/or lessen any significant <br />environmental effects of a project. <br />Chapter 7–Persons and Organizations Consulted-List of Preparers <br />This chapter lists all authors and agencies that assisted in the preparation of the Draft Program EIR, <br />by name, title, and company or agency affiliation. <br />Appendices <br />The Draft Program EIR appendices includes all notices and other procedural documents pertinent to <br />the Draft Program EIR, as well as technical material prepared to support the analysis.
The URL can be used to link to this page
Your browser does not support the video tag.