My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />15183 Consistency Checklist Consistency Checklist <br /> <br /> <br /> 33 <br />SECTION 4: CONSISTENCY CHECKLIST <br />Public Resources Code Section 21083.3(d) states that: <br />An effect of a project upon the environment shall not be considered <br />peculiar to the parcel or to the project, for purposes of this section, if <br />uniformly applied development policies or standards have been <br />previously adopted by the city or county, with a finding based upon <br />substantial evidence, which need not include an environmental impact <br />report, that the development policies or standards will substantially <br />mitigate that environmental effect when applied to future projects, <br />unless substantial new information shows that the policies or standards <br />will not substantially mitigate the environmental effect. <br />CEQA Guidelines Section 15183(b) states that: <br />In approving a project meeting the requirements of this section, a <br />public agency shall limit its examination of environmental effects to <br />those which the agency determines, in an initial study or other analysis: <br />(1) Are peculiar to the project or the parcel on which the project <br />would be located; <br />(2) Were not analyzed as significant effects in a prior FEIR on the <br />zoning action, general plan, or community plan, with which <br />the project is consistent; <br />(3) Are potentially significant off-site impacts and cumulative <br />impacts which were not discussed in the prior FEIR prepared <br />for the general plan, community plan or zoning action, or <br />(4) Are previously identified significant effects which, as a result <br />of substantial new information which was not known at the <br />time the FEIR was certified, are determined to have a more <br />severe adverse impact than discussed in the prior FEIR. <br /> <br />The following pages of this document contain a Consistency Checklist that <br />examines the proposed project’s potential environmental effects within the <br />parameters outlined in CEQA Guidelines Section 15183(b). The “Prior FEIR” <br />used for comparison is the Housing Element Update FEIR certified by the City <br />of Pleasanton on January 23, 2023, including all impact determinations and <br />significance thresholds utilized therein.
The URL can be used to link to this page
Your browser does not support the video tag.