My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />74 <br />General Avoidance and Minimization Measures Included in the East <br />Alameda County Conservation Strategy <br />The East Alameda County Conservation Strategy (EACCS) <br />contains the following general avoidance and minimization <br />measures to reduce the effects on focal species. These <br />measures are taken from Table 3-2 of the EACCS. <br />• Employees and contractors performing construction activities <br />shall receive environmental sensitivity training. Training shall <br />include review of environmental laws and Avoidance and <br />Minimization Measures (AMMs) that must be followed by all <br />personnel to reduce or avoid effects on covered species <br />during construction activities. <br />• Environmental tailboard trainings shall take place on an as- <br />needed basis in the field. The environmental tailboard trainings <br />shall include a brief review of the biology of the covered <br />species and guidelines that must be followed by all personnel <br />to reduce or avoid negative effects to these species during <br />construction activities. Directors, Managers, Superintendents, <br />and the Crew Foremen and Forewomen shall be responsible <br />for ensuring that crew members comply with the guidelines. <br />• Contracts with contractors, construction management firms, <br />and subcontractors shall obligate all contractors to comply <br />with these requirements and AMMs. <br />• The following shall not be allowed at or near work sites for <br />covered activities: trash dumping, firearms, open fires (such as <br />barbecues) not required by the activity, hunting, and pets <br />(except for safety in remote locations). <br />• Vehicles and equipment shall be parked on pavement, <br />existing roads, and previously disturbed areas to the extent <br />practicable. <br />• Off-road vehicle travel shall be minimized. <br />• Vehicles shall not exceed a speed limit of 15 miles per hour <br />(mph) on unpaved roads within natural land-cover types, or <br />during off-road travel. <br />• Vehicles or equipment shall not be refueled within 100 feet of a <br />wetland, stream, or other waterway unless a bermed and lined <br />refueling area is constructed. <br />• Vehicles shall be washed only at approved areas. No washing <br />of vehicles shall occur at job sites.
The URL can be used to link to this page
Your browser does not support the video tag.