My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 1 - CEQA Checklist
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 1 - CEQA Checklist
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:24:59 PM
Creation date
7/8/2024 11:58:32 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1650
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton—Merritt Property Project <br />Consistency Checklist 15183 Consistency Checklist <br /> <br /> <br />80 <br />remove particles of fill or excavated soil from the site, or could <br />erode soil down-gradient, if the flow were not controlled. <br />Deposition of eroded material in adjacent water features could <br />increase turbidity, thereby endangering aquatic life, and <br />reducing wildlife habitat. Implementation of appropriate <br />mitigation measures would ensure that impacts to aquatic <br />organisms would be avoided or minimized. Mitigation measures <br />may include Best Management Practices (BMPs) such as hay <br />bales, silt fencing, placement of straw mulch and hydro seeding <br />of exposed soils after construction as identified in the Storm <br />Water Pollution Prevention Plan (SWPPP). <br />Mitigation Measures for the Proposed Project <br />Implement MM BIO-1 and corresponding Conditions of Approval.
The URL can be used to link to this page
Your browser does not support the video tag.