My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET WORKSHOP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0507
>
CITY COUNCIL AGENDA PACKET WORKSHOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 1:02:47 PM
Creation date
7/9/2024 1:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/7/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 of 19 <br /> <br />Table 2: Transportation Impact Fee <br />Category 2018 <br />Maximum <br />Fee Rate <br />2018 Fee <br />Rate <br />Adopted <br />Percent of <br />Maximum <br />2024 Rate, <br />reflecting <br />CPI <br />adjustments <br />Single-Family (per unit) $9,112 $9,112 100% $11,642 <br />Multi-Family (per unit) $5,602 $5,602 100% $7,158 <br />Office (per sq. ft.) 14.22 14.22 100% $18.17 <br />Retail (per sq. ft) 23.87 18.80 78% $26.71 <br />Research/Development <br />(per sq.ft) <br />10.71 10.71 100% $13.69 <br />Industrial/Distribution <br />(per.sq.ft) <br />8.61 8.61 100% $10.99 <br />Lodging (per room) $6,008 $6,008 100% $7,675.76 <br /> <br /> <br />Table 3: Sewer Connection Fee <br />Category 2008 <br />Maximum <br />Fee Rate <br />2008 Fee <br />Rate <br />Adopted <br />Percent of <br />Maximum <br />2024 Rate <br />(no CPI <br />Adjustment <br />Single-Family (per unit) $2,150 $500 23% $500 <br />Fees for other uses vary by use and flow rate – see detailed table in Attachment 1 <br /> <br /> <br />Table 4: Water Connection Fee (See Attachment 1 for full table) <br />Category <br />Meter Size <br />[Meter <br />Equivalent] <br />1992 <br />Maximum Fee <br />Rate <br />1992 Fee Rate <br />Adopted <br />Percent of <br />Maximum <br />2024 Rate <br />5/8” [1] (typ <br />single family) <br />$1,200 $1,200 100% $1,200 <br />¾ [1.5] $1,800 $1,800 100% $1,800 <br />1” [2.5] $3,000 $3,000 100% $3,000 <br />1.5” [16] $6,000 $6,000 100% <br /> <br />$6,000 <br /> <br />Inclusionary Housing Ordinance and Lower-Income Housing Fees <br />The IZO was adopted in 2000 and has not been comprehensively updated or amended <br />since then. Key components of the IZO include: <br /> <br />• For projects of 15 units or more, a requirement to include affordable units as <br />follows: <br />o For multi-family projects 1, 15 percent of total units to be dedicated to very- <br />low or low-income households <br /> <br />1 Multi-Family Projects are defined as: A residential project consisting of condominiums, apartments, and similar <br />dwellings attached in groups of four or more units per structure and including multiple units located on a single <br />parcel of land under common ownership (PMC 17.44.030)
The URL can be used to link to this page
Your browser does not support the video tag.