My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET WORKSHOP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
0507
>
CITY COUNCIL AGENDA PACKET WORKSHOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 1:02:47 PM
Creation date
7/9/2024 1:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/7/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 of 19 <br /> <br />the study was prepared – this reflected a more limited scope of projects; <br /> <br />• The service-based model is more comprehensive in capturing expanded needs <br />across the entire city – for example, reflecting new fleet vehicles and equipment, <br />public works yard space, and space to accommodate City governmental <br />functions, among other elements; <br /> <br />• Several of the City’s master plans have been updated since 2018, including the <br />Trails System Master Plan, Climate Action Plan, Downtown Specific Plan, LPFD <br />Strategic Plan, and Capital Facilities 10-year State of Good Repair estimates. All <br />of these updates have provided more refined costs and, generally speaking, a <br />more expansive list of projects to meet community needs; and <br /> <br />• Construction costs for projects have escalated substantially since the prior study. <br />The Engineers News Record for San Francisco Construction Price Index from <br />2017 to 2024 has increased 32% (4.5% annually on average) which is above the <br />historical averages of 2.5-3% since the early 1990s. <br /> <br />Table 6: Preliminary Estimates of Future Facilities Costs <br />Fee Category Facilities <br />Addressed <br />2024 <br />Preliminary <br />Nexus Study <br />Estimates <br /> 2018 Nexus <br />Study <br /> <br />Cost Allocated <br />to New <br />Development <br />% Cost Allocated <br />to New <br />Development <br />% <br />Capital <br />Facilities <br />General <br />Government, <br />Public Works, <br />Library and <br />Recreation, <br />Parks and <br />Trails, Police, <br />Fire <br />$329,033,000 54% $69,754,000 31% <br />Transportation Roads, <br />intersections, <br />signal <br />improvements, <br />pedestrian and <br />bicycle facilities <br />$284,115,400 46% $153,575,900 69% <br /> TOTAL $613,148,400 100% $223,329,900 100% <br /> <br />It is noted that, while the impact fee study references both existing service levels (and <br />standards, where defined), and looks to City facilities master plans and studies and the <br />5-year Capital Improvement Program as a basis for determining both the array of <br />facilities and their costs, the impact fee study does not incorporate a detailed list of <br />facilities and projects that may be funded with impact fees. Although it is expected the <br />vast majority of projects funded with DIF will be those included in the City’s prioritized
The URL can be used to link to this page
Your browser does not support the video tag.