Laserfiche WebLink
7 <br />Exhibit A <br />CEMETERY BURIAL SERVICES SCOPE OF WORK <br /> <br />(To be used in conjunction with <br /> the City Standard Specifications and Standard Details, and <br /> the State Standard Specifications and Standard Plans) <br /> <br />All work shall be in accordance with the City of Pleasanton Standard Specifications and <br />Details dated November 2016. <br /> <br />All work not specifically called out as “Extra Work” in the below scope of work sections <br />shall be considered “Basic Landscape Maintenance”. <br /> <br />Item Description Quantity Unit Unit Price Total <br />1. Cemetery Burial Services 50 Year See <br />Exhibit B <br />for fee <br />schedule <br />As-needed <br />service not to <br />exceed <br />$62,250 <br />2. Basic Landscape <br />Maintenance including <br />labor, overhead and all <br />required tools, etc. in burial <br />service areas detailed in <br />Exhibit C. <br />12 Month $50/hr, <br />144 hr per <br />month, <br />$7,200/ <br />month <br />$86,400 <br />3. Extra Work 1 Allowance $50/hr $15,000 <br />4. As-Needed Backhoe 1 Month $3,500/ <br />month <br />$42,000 <br /> Total (not-to exceed): $205,650 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 183 of 782