My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2024 1:26:46 PM
Creation date
7/16/2024 1:19:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />14 <br /> <br /> <br /> <br />Water enough so that moisture penetrates throughout the root zone as often as <br />necessary to maintain healthy growth. <br /> <br />5.05 Dead Plant Material <br /> <br />If large sections of plant material are damaged or destroyed due to vandalism, such <br />replacement material will be provided or paid for by the City but shall be installed by the <br />Contractor as “Extra Work”. Documentation such as photos, a cost estimate, and a <br />Public Safety report for vandalism shall be provided to the City for such plant material. <br />Receipts for all plant material provided by the Contractor shall be given to the City. <br /> <br />5.06 Pest and Disease Control <br /> <br />All ornamental plant material will be inspected throughout the year to ensure against <br />disease, insect infestation, and pest damage. If an infestation occurs, appropriate plant <br />protection shall be taken. Any pruning necessary to remove infested or infected material <br />is included in this contract at no additional cost. <br /> <br />Gopher and squirrel abatement is not included in the scope of work and will be <br />performed by another contractor. <br /> <br />A. The spray materials shall meet all Federal, State and local requirements. <br /> <br />B. The Contractor shall use an insecticide spray that prevents or controls insect <br />infestations. <br /> <br />C. Application of pest and disease control materials shall be within the time best <br />suited, according to the manufacturer’s specifications and application rates, <br />for the eradication of the insects and diseases. <br /> <br />D. Any new or existing plants or soil that are damaged by either the lack of a <br />needed application or the over-application of controlled materials shall be <br />replaced by the Contractor at his expense. <br /> <br />E. Snails and slugs shall be controlled by the use of an approved non-arsenical <br />metaldehyde bait as prescribed by a qualified pest control advisor. <br /> <br />SECTION 6. TREE AND SHRUB CARE <br /> <br />6.01 General <br /> <br />Maintain trees and shrubs in a healthy, thriving condition by performing all necessary <br />operations. <br />Page 190 of 782
The URL can be used to link to this page
Your browser does not support the video tag.