Laserfiche WebLink
Ordinance No. 24-XXXX <br />Page 6 of 19 <br />engineer to the Director of Community Development before the first framing or <br />structural inspection by the Building and Safety Division. The height of the <br />structures shall be surveyed and verified as being in conformance to the <br />approved building heights as shown on Exhibit B or as otherwise conditioned. <br />18. FINAL INSPECTION: Final inspection by the Planning Division is required prior <br />to occupancy. <br />19. TRANSFORMERS: New electrical transformers shall be placed underground, or <br />aboveground and screened from view to the satisfaction of the Director of <br />Community Development. Details of the new electrical transformers, and any <br />screening architecturally compatible with the building, shall be included in the <br />building permit submittal and shall be subject to the review and approval of the <br />Director of Engineering/City Engineer and Director of Community Development <br />prior to building permit issuance. <br />20. MECHANICAL EQUIPMENT – SCREENING: The applicant shall effectively <br />screen from view all ducts, meters, air conditioning equipment, and any other <br />mechanical equipment, whether on the structure, on the ground, or on the roof, <br />with materials architecturally compatible with the building. Screening details shall <br />be shown on the plans submitted for building permit, the adequacy of which shall <br />be determined by the Director of Community Development. All required <br />screening shall be installed prior to final occupancy. <br />21. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained <br />completely within enclosures. Containers shall be stored within the enclosures at <br />all times except when being unloaded. The enclosures shall be sized to <br />accommodate trash, recycling, and green waste containers in compliance with <br />the Alameda County Mandatory Recycling Ordinance. The materials and colors <br />of any new enclosures shall match or be compatible with the primary building on <br />site and the gates shall be metal or solid wood unless otherwise approved by the <br />Director of Community Development. Elevation drawings and plan details, <br />including color and material of the enclosures noted, shall be included in the <br />building permit submittal and shall be subject to the review and approval of the <br />Director of Community Development prior to building permit issuance. <br />22. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with <br />the current City/Pleasanton Garbage Service recycling and composting <br />programs. <br />Green Building and Sustainability Measures <br />23. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a GHG <br />Emission Compliance Checklist shall be provided, to the Planning Division for <br />review and approval by the Director of Community Development. The measures <br />shall be shown on the building permit plans submitted to the Building and Safety <br />Division. The Checklist shall include notation indicating the sheet(s) the measure <br />Page 42 of 782