Laserfiche WebLink
Ordinance No. 24-XXXX <br />Page 9 of 19 <br />35. SCHOOL IMPACT FEES – RESIDENTIAL NEW CONSTRUCTION: Applicant <br />shall work with the Pleasanton Unified School District (PUSD) to develop a <br />program to offset this project’s long term effect on school facility needs in <br />Pleasanton. This program shall be designed to fund school facilities necessary to <br />offset this project’s reasonably related effect on the long-term need for expanded <br />school facilities. The method and manner for the provision of these funds and/or <br />facilities shall be approved by the PUSD and in place prior to building permit <br />issuance. Written proof of compliance with this condition shall be provided by <br />applicant to the City, on a form generated by the PUSD, prior to building permit <br />issuance. <br />36. CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with <br />copies of the final project conditions of approval. <br />BUILDING AND SAFETY DIVISION – 925-931-5300 <br />37. BUILDING AND FIRE CLEARANCE: Prior to issuance of a business license, the <br />applicant shall contact the Building and Safety Division and the Fire Department <br />to ensure the proposed use of the tenant space meets Building and Fire Code <br />requirements. If required, the applicant shall obtain all appropriate City permits. <br />ENGINEERING DEPARTMENT – LAND DEVELOPMENT – 925-931-5650 <br />38. CONDITIONS OF APPROVAL: These conditions of approval shall be depicted <br />on a plan sheet(s) in the submitted plans for construction. (Address this condition <br />prior to plan approval) <br />39. PUBLIC WORKS DIVISION FEES FOR SERVICE: The Public Works Division <br />assesses fees for services including plan-check, permit issuance, and inspection <br />according to the City’s adopted Master Fee Schedule. These fees are separate <br />and distinct from fees assessed by the Community Development Department <br />(including Planning and Building Division fees). The applicant is responsible for <br />payment of all Public Works Division fees prior to services rendered or permit <br />issuance, whichever is first. (Address this condition prior to plan approval) <br />40. CLEAN WATER PROGRAM: Land development projects that create and/or <br />replace more than 5,000 square feet (0.23 acres) of impervious surface are <br />considered “Regulated” according to Provision C.3.b of the Municipal Regional <br />Stormwater NPDES Permit that regulates stormwater runoff in Alameda County. <br />The Alameda Countywide Clean Water Program developed a C.3 Guidance <br />Manual to assist applicants in addressing these regulations. The Guidance <br />Manual is available for download at: <br />https://cleanwaterprogram.org/development/ <br />Page 45 of 782