My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
082024 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 11:07:43 AM
Creation date
8/14/2024 10:59:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2284 <br />Page 9 of 40 <br /> <br />10. PAVING MATERIALS: The color, material, design, and product specifications for the <br />paving materials used on-site shall be in conformance with the Approved Plans and <br />included with the building permit submittal. Any proposed modifications to the final <br />paving design details shall be subject to review and approval by the Planning Division <br />prior to issuance of building permits. <br /> <br />11. WINDOWS: Manufacturer type, design, material, and installation details for all windows <br />within the project shall be specified for each unit/building in conformance with the <br />Approved Plans in the building permit submittal. Any proposed modifications shall be <br />subject to review and approval by the Planning Division prior to issuance of building <br />permits. <br /> <br />12. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive <br />sign program submitted to the Planning Division under a separate application. <br /> <br />13. FENCE/WALL: All fencing and walls shall be shown on the construction plans with the <br />building permit submittal. The design and location must be approved by the Planning <br />Division and comply with all setback requirements. <br /> <br />14. OUTDOOR STORAGE: Outdoor storage shall be prohibited within front yards and <br />portions of lots visible from the street. <br /> <br />15. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit <br />submittal. The plan shall include photometric contours, manufacturer’s specifications on <br />the fixtures, and mounting heights. All exterior lighting including landscape lighting shall <br />be directed downward and designed or shielded so as to not shine onto neighboring <br />properties or streets. The photometrics shall be reviewed and approved by the City <br />Traffic Engineer and Director of Community Development prior to building permit <br />issuance. The type and location of all exterior light fixtures shall be reviewed and <br />approved by the Director of Community Development prior to building permit issuance. <br /> <br />16. BUILDING SURVEY: The applicant shall submit a building survey and/or record of <br />survey and a site development plan in accordance with the provisions of Chapter 18.68 <br />of the PMC. These plans shall be approved by the Chief Building Official prior to building <br />permit issuance. The site development plan shall include all required information to <br />design and construct site, grading, paving, drainage, and utilities. <br /> <br />17. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br />certification prepared by a California licensed land surveyor or registered civil engineer <br />to the Chief Building Official and Director of Community Development certifying the pad <br />elevations and building locations (setbacks) are conforming to the approved plans, prior <br />to receiving a foundation inspection for the structures. <br /> <br />18. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br />certification prepared by a California licensed land surveyor or civil engineer to the <br />Director of Community Development before the first framing or structural inspection by <br />the Building and Safety Division. The height of the structures shall be surveyed and <br />verified as being in conformance to the approved building heights as shown on Exhibit B <br />or as otherwise conditioned. <br /> <br />19. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br />occupancy. <br />Page 108 of 454
The URL can be used to link to this page
Your browser does not support the video tag.