My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
082024 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 11:07:43 AM
Creation date
8/14/2024 10:59:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2284 <br />Page 14 of 40 <br /> <br />Mitigation Measures, as recommended by the BAAQMD, shall be implemented to <br />reduce emissions to acceptable levels. The air quality construction plan shall be <br />included on all grading, utility, building, landscaping, and improvement plans <br />during all phases of construction and for access roads, parking areas, and <br />staging areas at construction sites. <br /> <br />• MM AIR-1b. The following measures pertain to project sites where residences <br />would be located within distances where the Bay Area Air Quality Management <br />District (BAAQMD) or the California Air Resources Board (ARB) recommends not <br />siting residential uses due to exposures to toxic air contaminants (TACs). For <br />example, the current 2005 ARB Land Use Book recommends that agencies avoid <br />siting new sensitive land uses within 500 feet of a freeway, urban roads with <br />100,000 vehicles/day, or rural roads with 50,000 vehicles/day. <br />Indoor Air Quality: In accordance with the recommendations of the BAAQMD, <br />appropriate measures (refer to Section 5 of the BAAQMD CEQA Guidelines) <br />shall be incorporated into building design in order to reduce the potential health <br />risk due to exposure of sensitive receptors to TACs, including, but not limited to: <br /> <br />(a) Locate sensitive receptors as far as possible within each project site from any <br />freeways, major roadways or other non-permitted TAC sources (e.g., loading <br />docks, parking lots). [The project Vesting Tentative Map and project PUD <br />comply with and implement this requirement.] <br /> <br />(b) Incorporate tiered plantings of trees (such as redwood, deodar cedar, live <br />oak, and/or oleander) to the maximum extent feasible between the sources of <br />pollution and sensitive receptors. [The project Landscaping Plans in the PUD <br />Development Plan comply with and implement this requirement.] <br /> <br />(c) Install, operate and maintain in good working order a central heating <br />ventilation and air conditioning (HVAC) system or other air take system in the <br />building, or in each residential unit, that meets or exceeds an efficiency <br />standard of Minimum Efficiency Reporting Values (MERV) 13, including the <br />following features: installation of high-efficiency filter and/or carbon filter to <br />filter particulates and other chemical matter from the building (either high- <br />efficiency particulate air [HEPA] filters or ASHRAE 85 percent supply filters). <br /> <br />(d) Retain a qualified HVAC consultant or Home Energy Rating System (HERS) <br />rater during the design phase of the project to locate air ventilation and the <br />HVAC system intakes based on exposure modeling from pollutant sources; <br />install indoor air quality monitoring in buildings. <br /> <br />(e) Applicants shall ensure that HVAC systems and air ventilation systems are <br />maintained, repaired, or replaced on an ongoing and as-needed basis. If the <br />project includes for-sale units, then the applicant shall prepare two operation <br />and maintenance manuals for the HVAC systems and the filters: one manual <br />shall be included in the recorded Conditions Covenants and Restrictions <br />(CC&Rs) that shall be recorded, and the manual shall be distributed to <br />building maintenance staff; the other manual shall be written for homeowners’ <br />with operating instructions and maintenance and replacement schedule for <br />the HVAC system and filters, and that manual shall be distributed to owners. <br />Project Specific Condition. <br /> <br />Page 113 of 454
The URL can be used to link to this page
Your browser does not support the video tag.