My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
082024 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 11:07:43 AM
Creation date
8/14/2024 10:59:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2283 <br />Page 17 of 17 <br /> <br />77. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be <br />designed and installed in accordance with current City Standards 704, 705, 706; State <br />Health and Safety Code; Title 17; and as required by the Director of Operations and <br />Water Utilities. All backflow preventer assemblies shall be tested and certified by a City <br />approved tester with the certification submitted to the City’s contractor, Aqua Backflow. <br />Testing will be performed at the time City water is turned on to the site. If an existing <br />backflow preventer is on the site it shall be tested and certified by an approved tester <br />with the certification submitted to the City’s contractor, Aqua Backflow, before project <br />water is drawn through it. An all-weather cover shall be placed over all backflow <br />prevention assemblies 4 inch and smaller. <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />Traffic Control <br /> <br />78. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and other <br />warning devices implemented during construction. The TCP shall also include time of <br />day/hours of lane closures and total number of days. <br /> <br />79. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br />reviewed and approved by the City Traffic Engineer prior to building permit issuance and <br />shall include the provision to monitor the street surfaces used for the haul route so that <br />any damage and debris attributable to the haul trucks is identified and corrected at the <br />expense of the applicant. <br /> <br /> <br />Page 98 of 454
The URL can be used to link to this page
Your browser does not support the video tag.