My WebLink
|
Help
|
About
|
Sign Out
Pleasanton Parks and Recreation Master Plan
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
HUMAN SERVICES
>
AGENDA PACKETS
>
2024
>
10022024
>
Pleasanton Parks and Recreation Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:09:42 PM
Creation date
9/27/2024 11:15:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P a g e | 1 A P P E N D I X B <br />APPENDIX B <br />City of Pleasanton <br />Assessment of Current Maintenance <br />Conditions and Recommendations for: <br />Existing Park and Recreation Facilities <br /> <br />Prepared by: RJM Design Group, Inc. <br />Timothy Gallagher, Senior Associate <br />November 2012 <br /> <br />Executive Summary <br /> <br />Overall Park and Recreation facilities within the City of Pleasanton were found to be well maintained, <br />visually attractive and safe with little to no deferred maintenance within park grounds and landscaping. <br />Substantial deferred maintenance needs were found within park structures, facilities, and buildings. <br />Based on observations and discussions with staff it appears that the level of maintenance is currently at <br />a Level 2 maintenance mode <br />established by the National Recreation <br />and Park Association which is <br />considered an acceptable operating <br />standard for municipal parks and <br />recreation systems the size of City of <br />Pleasanton. However, given the <br />projected population growth at build- <br />out and development of new parks <br />and recreation facilities including <br />future phases at Bernal Park, the <br />current resources may prove to be <br />strained and/or inadequate to fully <br />fund both operation/maintenance and <br />long-term capital upgrades and <br />development. Currently, the <br />Operations Services Department with <br />the City of Pleasanton in conjunction <br />with contract labor is currently able to deliver on all elements of park maintenance. <br /> <br />Since the Great Recession started in late 2007 the City of Pleasanton has added several new park and <br />recreation facilities. These include: <br /> Alviso Adobe—October 2008 <br /> Bernal Community Park, Phase I—September 2009 <br /> Marilyn Murphy Kane Trail—October 2009 <br /> Firehouse Arts Center—September 2010 <br /> <br />During the same time the “parks budget” has suffered a dramatic 19% reduction in funding in actual <br />expenditures for the fiscal year ending June 2008 compared with fiscal year ending in June 2012. Table <br />1 displays the five previous fiscal years in budgeted dollars and actual expenditures. <br /> <br /> <br />Tennis and Community Park
The URL can be used to link to this page
Your browser does not support the video tag.