My WebLink
|
Help
|
About
|
Sign Out
Pleasanton Parks and Recreation Master Plan
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
HUMAN SERVICES
>
AGENDA PACKETS
>
2024
>
10022024
>
Pleasanton Parks and Recreation Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:09:42 PM
Creation date
9/27/2024 11:15:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P a g e | 11 A P P E N D I X B <br />Recommendations <br /> <br /> Continue to conduct regular inspections of park sidewalks to identify settlement and or up <br />lifting, exposed edge, and cracks that may pose a safety hazard to park users. <br /> <br /> Develop a planting list of tree species that are acceptable for planting close to sidewalks, as well <br />as identifying species such as liquidambar (Liquidambar styraciflua), which has roots that grow <br />near the surface, commonly causing uplift to sidewalks. <br /> <br />Trails <br /> <br />Existing Conditions <br /> <br />The City of Pleasanton has developed an extensive trail network within the city and in conjunction with <br />other public agencies such as East Bay Regional Park District. Developed trails include: <br /> Alamo Canal Trail 3.38 miles <br /> Arroyo Mocho Trail 2.90 miles <br /> Del Valle/Centennial Trail 2.00 miles <br /> Iron Horse Trail 1.00 miles <br /> Marilyn Murphy Kane Trail 1.80 miles <br /> Bernal Creek Trail 1.00 miles <br /> Augustin Bernal Trail 4.73 miles <br /> Callippe Trail 3.75 miles <br /> Moller Trail 1.46 miles <br /> The Preserve Trail 1.84 miles <br /> <br />While the City has 23.86 miles of trails, there is limited opportunity for the trails to serve as <br />transportation routes for bicycles, due to the <br />primitive surface utilized. Development of a shared <br />use pathway could include both paved and <br />decomposed granite surfaces, providing <br />opportunity for both the casual walker and <br />utilization of the trail as a transportation route. <br /> <br /> <br />Recommendations <br /> While the City currently offers 23.86 miles <br />of walking/jogging trails, efforts should be <br />made to expand walking/jogging trails and <br />to improve the supply of Class 1 and 2 <br />bicycle trails. The following actions should <br />be taken by the City: <br />o Work with Zone 7 Water Agency to explore opportunities for opening of <br />waterways/drainage areas for trail use. In many cases, these routes would best be <br />served as a paved surface. <br />o Implement the Pleasanton Bicycle and Pedestrian Master Plan which calls for an <br />additional 17.6 miles of Class 1 and 24.8 miles of Class II bicycle trails.
The URL can be used to link to this page
Your browser does not support the video tag.