My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
100124
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 1:31:39 PM
Creation date
10/1/2024 1:30:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/1/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br />population, with a lesser focus on housing for lower-income families, those experiencing <br />homelessness, and certain other target populations, such as veterans. Each of these <br />populations has housing needs that are not well met in Pleasanton. As described in the memo, <br />the target population would heavily influence the type of housing that would need to be built, <br />and decisions such as site size, amenities, location, and related services, affect overall project <br />costs and eligibility for various types of non-local funding. <br /> <br />2) Should the City's focus be on a "quick build" project that could potentially be <br />constructed at relatively low cost and address the most urgent housing needs, or on <br />creation of more permanent and long-term housing solutions that come with higher <br />costs and a longer period to plan, design, fund and build? <br />As described in the background memorandum, cities have developed a number of "quick build" <br />projects using non-traditional and innovative approaches (e.g., tiny homes, quick-build modular <br />units). The key advantage of these projects is how rapidly and relatively less expensively they <br />can be constructed, which is beneficial when considering populations with particularly critical <br />needs, such as those experiencing homelessness. However, such projects generally require <br />the donation of a site (whether a City property or one donated by a non-profit or religious <br />organization) as well as ongoing funding for costs of operation and provision of services. <br />Additionally, in some circumstances and locations, housing projects for homeless residents <br />could generate neighborhood concerns that must be addressed. <br /> <br />On the other hand, while traditional, stick-built projects may generate fewer such concerns, <br />and create a permanent stock of new units, they are substantially more expensive to build, <br />typically requiring several years to plan and design, to assemble funding, and to construct. <br />And, because permanent housing typically demands a project size (75+ units) and high- <br />density, multi-family building types to be financially feasible and competitive for necessary <br />funding, projects can also cause neighborhood concerns around perceived project impacts. <br /> <br />3) What City resources should be considered to support a project? <br />The obvious manner in which the City could support an affordable housing project would be by <br />allocating a portion of the existing Lower Income Housing Fund (LIHF) balance, which is a fund <br />restricted for this purpose. However, the City Council could also direct staff to explore potential <br />use of City-owned land via a ground lease arrangement, allocation of formula-based <br />allocations of state and federal funds, and in-kind support such as waiver of fees or other City- <br />levied charges, or support through entitlement (e.g., completion of the CEQA document). As <br />discussed at length in the background memo, the substantial costs associated (in particular) <br />with housing construction mean that any project will realistically rely on several funding <br />sources, of which local funds may end up being a small fraction. <br /> <br />There is currently more than $14 million in the Lower Income Housing Fund, and the LIHF <br />balance is projected to increase significantly (to $18-$20 million) once several approved <br />housing projects in the pipeline pay their required affordable housing fees in accordance with <br />the IZO requirements. However, it is noted that the City annually allocates LIHF to various <br />housing programs and to cover City administration costs, and there may be benefit in holding <br />back an increment of the available funds to allow the City to take advantage of (as yet <br />unforeseen) opportunities for partnerships or investments in affordable housing, subject to <br />development of a future strategy and/or policy guidance to evaluate such requests (see <br />discussion below). <br /> <br />Page 63 of 90
The URL can be used to link to this page
Your browser does not support the video tag.