Laserfiche WebLink
<br /> <br />Page 8 of 13 <br /> <br />In all cases, affordable housing projects benefit from being located near services and transit so <br />that residents who may have limited or no access to a private vehicle can meet their basic <br />needs, or travel to other locations. <br /> <br />Affordable Housing, Construction Types <br />Traditional or Stick-Built Permanent Construction <br />Traditional “stick-built” (constructed on-site) construction is the most common way to build <br />affordable housing, but also the most costly. California has high construction costs due to the <br />cost of materials, stringent energy, and seismic design standards, and, in the case of publicly- <br />funded projects with complex multi-layered financing and lengthy build periods (typically 12-18 <br />months or longer), higher labor costs due to requirements to pay prevailing wages. However, <br />these types of permanent units can provide housing opportunities over the very long-term, <br />including over many decades. To date, all the City-restricted properties in Pleasanton were <br />built using traditional construction. <br /> <br />While stick-built construction remains the most common form of providing permanent <br />affordable housing, other construction methods for multi-family housing have been gaining <br />popularity, primarily due to cost-effectiveness and shorter construction timelines. Modular <br />construction is a process in which a section of a building is constructed off-site and that <br />prefabricated component, comprising repeated sections called modules, is delivered and <br />installed onsite. Modular construction is known for its speed, resulting in shorter schedules and <br />significantly reduced construction costs. <br /> <br />In terms of project characteristics, permanent affordable units, whether stick-built or modular <br />construction, are costly to build. A survey of recently completed affordable housing projects <br />that (among other sources) utilized County Measure A1 funds, showed typical construction <br />costs for range of projects built in the last 1-4 years, to be between more than $700,000 and <br />over $1million per unit to construct.2 The Sunflower Hill Project in Pleasanton, with a total <br />construction cost of approximately $751,000 per unit, falls within this range. <br /> <br />As a result, affordable housing projects typically require a “mosaic” of funding – local funds, <br />grants, tax-credit financing, developer contributions, or other outside sources. Further, <br />because of high costs and typical funding program requirements, permanent, stick-built <br />housing most commonly provides a relatively large number of units (75+) to achieve economy <br />of scale and be a competitive project applying for tax credit funding, and, depending on parking <br />requirements and other on-site needs, requires a site of at least 1-2 acres to construct. <br /> <br />Short-Term/Temporary and Pre-Fabricated Units <br />In recent years, many communities have sought even more rapid and cost-effective ways to <br />meet their most critical housing needs, particularly with respect to housing opportunities for the <br />populations experiencing homelessness. An innovative solution embraced by a number of Bay <br />Area communities has been the use of converted, non-traditional pre-fabricated units – such <br />as “TufSheds” or shipping containers, to create short-term housing, typically sited on public <br />land, and with basic amenities and services provided in mobile/modular units on site. <br /> <br /> <br />2 Source: https://measurea1.acgov.org/rental-project-summaries/ <br />Page 73 of 90