My WebLink
|
Help
|
About
|
Sign Out
Pleasanton Parks and Recreation Master Plan
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
CIVIC ARTS
>
AGENDA PACKETS
>
2024
>
10072024
>
Pleasanton Parks and Recreation Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:09:42 PM
Creation date
10/3/2024 11:53:45 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P a g e | 20 A P P E N D I X B <br />Comet Max Demoss 2012 Outdoor <br />Sculpture <br />Bronze and <br />Silver on <br />pink granite <br />Firehouse Arts <br />Center <br />Joyful <br />Empowerment <br />TBD 2012 Bronze <br />Sculpture <br /> TBD <br />Rock, Paper, <br />Scissors <br />TBD 2012 Outdoor <br />Sculpture <br /> TBD <br /> <br /> <br /> <br />Recommendations <br /> <br /> The City contributes approximately $50,000 annually towards the development and <br />maintenance of public art throughout the community. The City should evaluate developing a 1% <br />to 2% for the Public Art program as part of future capital developments and earmarking the <br />annual contribution solely towards maintenance of public art. This percentage of funds could be <br />“pooled” to fund the design and development of public art components of future park <br />developments. Currently many public agencies statewide and nationally successfully operate <br />such a program. <br /> <br />Sustainable Practices <br /> <br />Existing Conditions <br /> <br />While the City of Pleasanton has currently taken initial steps in the development of sustainable <br />practices, the City is encouraged to develop a strategy that fully engages stakeholders in the process of <br />identifying and implementing sustainability improvements within existing parks and in the development <br />of new park facilities. An initial phase for the City would include conducting assessments, identifying <br />opportunities and establishing objectives, benchmarks, or targets for specific activities. <br /> <br />Efforts to develop and implement sustainable principals in the planning, design, construction and <br />operation of park facilities within the City will have immediate results in best practices, costs savings, <br />public perception and leadership within the community. <br /> <br />Sustainability has become an overarching concept through which we understand the rational and <br />reasonable consumption of resources. Sustainability is generally regarded through three lenses: <br />economy, society and environment. Advocates of sustainability emphasize the importance of <br />establishing linkages among these three dimensions to fully implement sustainable practices. <br /> <br />Sustainability within the operations of parks and recreation is frankly the nature of the business. Parks <br />and recreation departments nationwide fortify the social, economic and environmental landscapes <br />within the local communities. Sustainability could provide the vehicle for addressing many of the City’s <br />most pressing challenges, such as better aligning the design and construction of parks with their long- <br />term maintenance, storm water retention, water quality, and the economic values of sustainability that <br />provides operational savings, thus providing additional funding for long-term capital. <br /> <br />The following is a potential list of sustainable practices which City of Pleasanton could include within the <br />sustainable management system for Parks and Recreation. These include:
The URL can be used to link to this page
Your browser does not support the video tag.