Laserfiche WebLink
<br /> <br />4-9 <br /> <br />Pleasanton Parks and Recreation Master Plan <br />Section Four – Recreation Facility Recommendations  <br />2014  <br />  <br />4.6  Summary of Proposed Improvements at Existing Parks and  <br />Facilities  <br />  <br />A comprehensive, detailed analysis of every existing park and facility in Pleasanton is included in this  <br />Master Plan process, and included in the Appendix of the report.  In summary, the following are the  <br />highlights of the analysis:  <br />  <br /> The parks in general are very well maintained, as evidenced by visual survey as well as by public  <br />opinion gathered in the telephone survey  <br /> Tree maintenance program is very effective  <br /> There are opportunities to reduce turf in many non‐athletic applications and thereby reduce water  <br />and fertilizer use  <br /> Outdoor basketball courts, in general, are in need of resurfacing  <br /> Creeks that run through parks are good candidates for naturalization with native plant material  <br /> Gaps were found in the trail system that should be addressed by the ongoing implementation of the  <br />recommendations found in the Pedestrian and Bicycle Master Plan adopted in 2010.  <br />  <br />The following summary provides a list of all the recommended capital maintenance suggestions  <br />provided in the parks analysis report:  <br />  <br />Exhibit 4.6‐1  Summary of Proposed Improvements in Existing City Parks and Facilities  <br />  <br />Existing Park Proposed Improvements  <br />Alviso Adobe     <br />Community Park  <br /> Add group picnic shelter   <br /> Consider additional amenities that will facilitate more “hands‐on”  <br />interpretative programming and experiences  <br />Amador Valley  <br />Community Park  <br /> Renovate Amador Recreation Center and re‐landscape grounds  <br /> Chip seal parking lot  <br /> Renovate Aquatic Center to add recreation pool  <br /> Renovate Cultural Arts Building  <br />Century House   Consider operating the facility as a living history museum  <br /> Consider renovating facility for increased usage  <br />BMX Facility  <br />(Partnership w/ EBRPD)  <br /> Add restroom  <br /> Add parking lot  <br /> Add irrigation system  <br />Creekside Park  Add children’s ADA swing  <br />Del Prado Park  Resurface Basketball Court  <br /> Add BBQ grill  <br />Delucchi Park  Redevelop park per preliminary plans  <br />  <br />Fairlands Park  Add benches and picnic tables  <br /> Complete the previously planned pedestrian lighting installation that  <br />was partially constructed  <br />