Laserfiche WebLink
Introduction <br /> <br />Addendum to the City of Pleasanton Downtown Specific Plan Final Environmental Impact Report 1 <br />1 Introduction <br />This document is an Addendum to the Downtown Specific Plan Environmental Impact Report (Final <br />EIR) (State Clearinghouse #2001032014), which was prepared for the City of Pleasanton’s <br />Downtown Specific Plan, hereinafter referred to as the “DSP.” The Final EIR, which is incorporated <br />herein by reference, was certified in May 2019 by the City of Pleasanton. <br />The 475 and 493 St. John’s Street Mixed-Use Project (hereinafter referred to as “the Barone’s <br />project”) would involve changes to the previously approved DSP analyzed in the Final EIR. Therefore, <br />some modifications and additions are necessary to the previously certified Final EIR for the DSP. <br />Pursuant to Section 15164 of the CEQA Guidelines, codified in Sections 15000 et seq. of Title 14 of <br />the California Code of Regulations (CCR), a lead agency shall prepare an addendum to a previously <br />certified EIR if some changes or additions are necessary, but none of the conditions described in <br />Section 15612 calling for preparation of a subsequent EIR have occurred. Under Section 15162 (a), <br />where an EIR has been certified for a project, no subsequent EIR shall be prepared for the project <br />unless the lead agency determines, on the basis of substantial evidence in light of the whole record, <br />that there are substantial changes in the project or circumstances or substantially important new <br />information that will cause the project to have significant new impacts or substantially increase the <br />severity of previously identified significant impacts. <br />Specifically, the CEQA Guidelines state: <br /> The lead agency or responsible agency shall prepare an addendum to a previously certified EIR if <br />some changes or additions are necessary, but none of the conditions described in Section 15162 <br />calling for preparation of a subsequent EIR have occurred (Section 15164 (a)). <br /> An addendum need not be circulated for public review but can be included in or attached to the <br />final EIR or adopted negative declaration (Section 15164 (c)). <br /> The decision-making body shall consider the addendum with the final EIR or adopted negative <br />declaration prior to making a decision on the project (Section 15164 (d)). <br /> A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 <br />should be included in an addendum to an EIR, the lead agency’s findings on the project, or <br />elsewhere in the record. The explanation must be supported by substantial evidence (Section <br />15164 (e)). <br />This addendum has been prepared in accordance with relevant provisions of CEQA (California Public <br />Resources Code Section 21000, et seq.) and the CEQA Guidelines. It describes the Barone’s project <br />and compares its impacts to those identified in the Final EIR for the DSP. The analysis demonstrates <br />that the Barone’s project does not require the preparation of a subsequent EIR.