Laserfiche WebLink
Barone’s project Detailed Report, 10/4/2023 <br />71 / 92 <br />Removed ————————————————— <br />Subtotal ————————————————— <br />—————————————————— <br />Annual ————————————————— <br />Avoided ————————————————— <br />Subtotal ————————————————— <br />Sequeste <br />red <br />————————————————— <br />Subtotal ————————————————— <br />Removed ————————————————— <br />Subtotal ————————————————— <br />—————————————————— <br />5. Activity Data <br />5.1. Construction Schedule <br />Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description <br />Demolition Demolition 1/1/2025 1/4/2025 6.00 4.00 — <br />Site Preparation Site Preparation 1/5/2025 1/6/2025 6.00 1.00 — <br />Grading Grading 1/7/2025 2/18/2025 6.00 37.0 — <br />Building Construction Building Construction 2/19/2025 8/18/2026 6.00 468 — <br />Paving Paving 8/19/2026 8/19/2026 6.00 1.00 — <br />Architectural Coating Architectural Coating 8/20/2026 2/19/2027 6.00 158 — <br />5.2. Off-Road Equipment <br />5.2.1. Unmitigated