Laserfiche WebLink
Barone’s project Detailed Report, 10/4/2023 <br />78 / 92 <br />Phase Name Residential Interior Area Coated <br />(sq ft) <br />Residential Exterior Area Coated <br />(sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />Architectural Coating 74,190 24,730 16,547 5,516 1,635 <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (Cubic Yards)Material Exported (Cubic Yards)Acres Graded (acres)Material Demolished (Building <br />Square Footage) <br />Acres Paved (acres) <br />Demolition 0.00 0.00 0.00 1,877 — <br />Site Preparation 0.00 0.00 0.50 0.00 — <br />Grading 0.00 4,200 74.0 0.00 — <br />Paving 0.00 0.00 0.00 0.00 0.78 <br />5.6.2. Construction Earthmoving Control Strategies <br />Non-applicable. No control strategies activated by user. <br />5.7. Construction Paving <br />Land Use Area Paved (acres)% Asphalt <br />Single Family Housing 0.15 0% <br />General Office Building 0.00 0% <br />Parking Lot 0.22 100% <br />Other Asphalt Surfaces 0.40 100% <br />5.8. Construction Electricity Consumption and Emissions Factors <br />kWh per Year and Emission Factor (lb/MWh) <br />Year kWh per Year CO2 CH4 N2O <br />2025 0.00 204 0.03 < 0.005