My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P21-1173, PUD-146 and Tract 8631: 475 & 493 St. John Street Planning Commission <br />30 of 32 <br />Project Noise and Vibration Impacts on Adjacent Properties: The development of the <br />property will generate added urban noise; however, as mentioned previously, noise levels are <br />not expected to change substantially from those currently experienced in the area because <br />overall activity levels at the site would be modest. Ambient noise levels could decrease for <br />some of the adjacent properties due to the shielding of traffic and train noise by the proposed <br />buildings. <br /> <br />Short-term construction noise would be generated during any new construction on this site. <br />The City normally allows construction hours from 8 a.m. to 5 p.m., Monday through Friday, with <br />Saturday construction allowed if nearby residents are unlikely to be impacted by construction <br />noise or activities. Since there are existing residences directly adjacent to the proposed project <br />site, staff is recommending Saturday construction not be allowed. Construction equipment <br />would be required to meet Department of Motor Vehicles (DMV) noise standards and be <br />equipped with muffling devices. <br /> <br />Green Building <br />As required by the City’s Green Building Ordinance (PMC Ch. 17.50), the proposed project is <br />required to meet at least a “Green Home.” Some of the proposed green building measures <br />include: employ strategies that use less water and improve energy performance for the <br />building; reduce potable water consumption for irrigation on the subject site as a whole; utilize <br />materials with recycled content; utilize FSC-certified wood in construction materials; and utilize <br />low-VOC (volatile organic compound) emitting flooring, paints, coatings, adhesives, and <br />sealants. The applicant will meet all Green Building Ordinance requirements , which will be <br />verified at the time of building permit issuance. Therefore, staff supports the applicant’s green <br />building measures in the project. <br /> <br />Climate Action Plan <br />The City’s adopted Climate Action Plan (CAP) 2.0 was reviewed by the Bay Area Quality <br />Management District (BAAQMD) and was deemed a “Qualified Greenhouse Gas Reduction <br />Strategy” in accordance with the District’s CEQA guidelines. Implementation of the CAP will <br />occur over several years. The CAP consists of amendments to regulations and policies related <br />to Land Use and Transportation, Energy, Solid Waste, and Water and Wastewater, which <br />result in reductions in greenhouse gas emissions in compliance with the targets set by AB 32, <br />California’s Global Warming Solutions Act of 2006. <br /> <br />Staff completed an analysis of how the proposed project is consistent with or implements the <br />applicable measures outlined in the City of Pleasanton’s CAP. As a mixed-use project located <br />within the vicinity of a commuter bus line and the ACE train, the proposed project is consistent <br />with Land Use Goal 1 of the CAP: to reduce vehicle miles traveled (VMT) through infill and <br />higher density development. In addition, several Strategies and Supporting Actions related to <br />water and energy conservation from the CAP are implemented in the proposed project , <br />including that new units would be all-electric and not contain any new gas facilities, or are <br />required as conditions of approval. <br /> <br />School Impacts <br />As a mixed-use development which includes 14 new single-family homes, the project can be <br />expected to generate a demand on school facilities. Pursuant to State law, payment of school <br />impact fees set by the state legislature is deemed adequate mitigation for school-related
The URL can be used to link to this page
Your browser does not support the video tag.