My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2024
>
10-23
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 11:08:57 AM
Creation date
11/6/2024 10:59:50 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
531
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />P21-1173, PUD-146, and Tract 8631 PC-2024-17, October 23, 2024 <br /> <br />13 of 34 <br /> <br />8 a.m. to 5 p.m., Monday through Friday. No construction shall be allowed on State or <br />Federal Holidays or Saturdays or Sundays. The Director of Community Development <br />may allow earlier “start times” or later “stop times” for specific construction activities. All <br />construction equipment shall meet Department of Motor Vehicles (DMV) noise <br />standards and shall be equipped with muffling devices. Prior to construction, the hours <br />of construction shall be posted on site. Project Specific Condition. <br /> <br />32. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br />vehicle are not allowed on the construction site except when needed as sleeping <br />quarters for a security guard subject to receipt of a temporary conditional use permit <br />(per PMC 18.116.010.E). <br /> <br />33. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br /> <br />34. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare <br />a construction and parking management plan to address impacts and parking demands <br />during the construction phase of the project. The construction and parking management <br />plan shall be subject to review and approval by the City Traffic Engineer and Director of <br />Community Development prior to issuance of a demolition permit, or the first building <br />permit, whichever comes first. The following items shall be incorporated into the <br />construction and parking management plan: <br /> <br />a. Show truck route for construction and delivery trucks that does not include <br />neighborhood residential streets, unless approved by the City Traffic Engineer; <br />b. Show construction vehicles and equipment parking area, materials storage, <br />temporary fencing, construction trailer location, and construction <br />contractors/workers parking area. <br />c. Sidewalk closure or narrowing is not allowed during on-site construction activities <br />without prior approval by the City. <br /> <br />35. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br />project site and as far as possible from existing residences and shall be emptied <br />regularly to prevent odor. <br /> <br />36. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off <br />hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt <br />on this site shall occur without specific review and approval by the Director of <br />Community Development. <br /> <br />37. NOTICE OF CONSTRUCTION: Prior to construction, the applicant shall notify <br />neighbors within 300-feet of the project site of the construction schedule in writing. Such <br />notice shall include contact names and numbers for property owner, agent or contractor.
The URL can be used to link to this page
Your browser does not support the video tag.