My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Quotation TESCO CONTROLS <br />File Ref. 24G115Q02.doc Page | 3 of 5 <br />Project Bid Clarifications <br />Unless otherwise indicated by the Scope of Work above, this quote is to furnish only and does not include any <br />trade labor, trade work, construction work, site improvement, contractor services, or any trade installation <br />services. Any trade labor and/or related trade work shall be performed by others/contractor. <br />Unless otherwise indicated by the Scope of Work above, the following is not included within this quotation:▫Conduit, field wire, tubing, or basic trade installation materials (brackets, screws, bolts, j-box, stanchions, <br />pull-box, etc.)▫Instrumentation mounting components, brackets, stanchions, sunshields, etc.▫Instrumentation, devices, components, or equipment not specifically identified in the above quotation. <br />▫Local control stations and/or field mounted disconnects. <br />▫Fiber optic patch panels, cable, splicing or terminations.▫Networking infrastructure or architecture modifications to existing facilities. <br />▫Any 3rd party testing, harmonic testing/analysis, protective device coordination study, short-circuit <br />analysis, or Arc-Flash Risk Assessment (AFRA) services.▫Electrical interconnection diagrams for equipment not furnished by TESCO. <br />▫ISA process control loop diagrams.▫Signal loop diagrams for equipment not furnished by TESCO. <br />▫Seismic Anchorage Calculations or Testing.▫Switchboard and Manual Transfer Switch (provided by Others). <br />▫Motor Control Center (provided by Others).▫Instrumentation (provided by Others). <br />▫Portable Generator Connection Cabinet.▫Intrinsic Safety Barriers. <br />▫Cellular Monitoring Equipment or VPN Router. <br />▫NETA Circuit Breaker Testing.▫Sump Pump (P-005). <br />▫Flow Control Valves (FCV-001, FCV-002, & FCV-003).▫Suction & Discharge Manifold Pressure Transducers (Factory Installed). <br />▫Fluoride Pumps. <br />Terms & Conditions <br />Submittals:▫Product/Equipment Submittals: Initial equipment submittal(s) “schedule” to be provided approximately <br />six (6) weeks after receipt of purchase order, written notice of intent, or notice to proceed. Lead-time for <br />this “schedule” may be subject to delays imposed by 3rd party submittal providers. Submittal “schedule” <br />will list all project submittals and will indicate lead-times for each product/equipment submittal. <br />Generation of submittal(s) may be subject to availability of specified material components; supply-chain <br />constraints may impact material item selections, therefore, may impact submittal lead-times.▫Information Submittals: Information Submittals are dependent on the approval of Product/Equipment <br />Submittals. An updated Submittal Schedule will be provided after receiving approval of corresponding <br />Product/Equipment Submittal showing schedule and lead-times for Information Submittals. <br />Page 207 of 658
The URL can be used to link to this page
Your browser does not support the video tag.