My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
111924 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2026 12:24:12 PM
Creation date
11/13/2024 3:02:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/19/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 of 15 <br /> <br />As described in Table 12 below, collectively, expenditures from the Repair and Replacement <br />funds were $6.0 million less than budgeted in FY 2023/24. Any unspent funds remain in the <br />Repair and Replacement funds to be expended on projects and equipment or vehicle <br />replacements in the future. Actual net transfers ended up with a slight difference due to an <br />interest payment from the Recycled Water Operating Fund to the Equipment Replacement <br />Fund based on the interfund loan to pay off the outstanding balance of the 2017 water <br />revenue bond. As approved by the City Council at its April 16, 2024 meeting, the Recycled <br />Water Operating Fund will pay back the loan amount of $965,160 plus applicable interest <br />rates, based on the investment return generated by the City’s investment pool. <br /> <br />It is worth noting that many of the City’s Repair and Replacement funds do not have an <br />adequate fund balance to cover necessary project costs and/or replace aging equipment or <br />vehicles in a timely manner. For example, the Information Technology Repair and <br />Replacement Fund, which funds replacement costs for the City’s technology equipment, such <br />as computers, monitors, servers, network equipment, has an estimated ending fund balance <br />of just over $1.1 million. The Facilities Repair and Renovation Fund, which is used as a <br />primary funding source for non-major facility repairs and modifications, as well as <br />unanticipated repairs at any of the City’s more than 100 facilities and structures, has just a <br />$2.4 million fund balance. <br /> <br />As part of the FY 2023-FY25 biennial budget development process, staff performed a <br />preliminary analysis to estimate the level of contributions needed from the General Fund to the <br />Repair and Replacement Funds and determined that the current annual contribution levels are <br />not sufficient. A more comprehensive analysis is planned as part of the preparation of the <br />Asset Management Plan that is now underway to better estimate an appropriate level of <br />funding needed to support each Repair and Replacement Fund. <br /> <br />Table 12. Repair & Replacement Funds - Amended Budget vs. Actual <br /> <br /> <br />Workers’ Compensation Funds. There are two Workers’ Compensation funds: one for the <br />City of Pleasanton workers’ compensation expenses and liabilities and the other for <br />Livermore-Pleasanton Fire Department’s (LPFD) workers’ compensation expenses and <br />liabilities. While there is, and has been, sufficient cash in both funds to cover actual workers’ <br />compensation expenses, the incurred but not expensed claims and future liability cause both <br />funds to have negative fund balances. That said, as described in Tables 13 and 14 below, the <br />City’s claims paid is approximately $0.1 million lower, and future liability is higher than <br />expected by $0.1 million. For LPFD, claims paid and future liability are higher by <br />approximately $0.1 million and $1.2 million, respectively. The City’s Workers’ Compensation <br />Fund had a negative fund balance of $3.7 million, and LPFD had a negative fund balance of <br />$2.4 million, with $1.2 million (50 percent) belonging to Pleasanton. <br />Page 242 of 658
The URL can be used to link to this page
Your browser does not support the video tag.