Laserfiche WebLink
Completed Projects in <br />FY 2023/24 <br />5 <br />•Library Roof Replacement <br />•Fire Station 3 <br />•Bernal Bridge Abutment <br />•Annual Street Resurfacing <br />•Annual Sidewalk and Intersection Ramp Improvement <br />•Annual Slurry Seal <br />•Annual Traffic Button and Line Marker <br />•Val Vista Underdrain Improvements <br />•Val Vista Community Park Playground Replacement <br />•Library Roof and Window Replacement <br />•OSC Generator Replacement <br />•Alviso Adobe South Wall Repair <br />•Citywide fence installation and repair <br />•St. Mary Street Parking Lot Lighting Improvements <br />•Augustin Bernal Mountain Bike Trail <br />•Cricket Pitch at Ken Mercer Sports Park <br />$61.4 Million of Projects in <br />Active Design/Construction <br />•Annual Water Distribution System Improvements <br />•Storm Drain Improvements <br />•W. Las Positas Blvd. Multimodal Reconstruction <br />•Library Lighting <br />•Hopyard Rd and Owen Dr. Intersection <br />•Lions Wayside and Delucchi Parks <br />•Police Department Shooting Range <br />•Water System Management Plan <br />•Bernal Ave Water Line Improvements <br />•Ken Mercer Motor Control Center Replacement <br />•Valley Avenue Soundwall Construction <br />•Annual Repaving Program <br />•Annual Curb and Gutter Program <br />6 <br />Page 277 of 658