Laserfiche WebLink
Low High Minimum Maximum <br /># <br />Estimated Cost ($2024)Cost Included in TIF Program <br />Existing Deficiency?Percent Eligible for <br />Fee ProgramRoadway Explanation of <br />Eligibility <br />Percent Pleasanton <br />Trips, from Model <br />Percent Pleasanton <br />Trips, AdjustedImprovementsIntersection/Segment <br />64 Val Vista Bridge Improvements Val Vista Community Park Trail & Arroyo de la Laguna <br />Update bridge railing to meet Caltrans <br />standards $140,000 $140,000 18%$25,200 $25,200 <br />65 Arroyo de la Laguna Arroyo Mocho to Arroyo del Valle <br />East bank: <br />10 foot paved bikeway <br />Compacted soil/decompressed granite side <br />path for pedestrian/runner/equestrian use <br />$1,870,000 $2,990,000 18%$336,600 $538,200 <br />66 W Las Positas/Arroyo de la Laguna Trail Access Point Arroyo de la Laguna to W Las Positas <br />Access gate and pathway from north side of <br />W Las Positas Road $170,000 $170,000 18%$30,600 $30,600 <br />67 Arroyo de la Laguna Trail - South Extension Arroyo del Valle to near south end of Laguna Creek Lane <br />10 foot paved bikeway <br />Compacted soil/decompressed granite side <br />path for pedestrian/runner/equestrian use <br />Requires new bike/ped bridge at junction of <br />Arroyo del Valle. Intersection improvements at <br />Bernal Ave, Potential access points at <br />Lylewood Drive, Bernal Avenue, and along <br />Laguna Creek Lane <br />$3,070,000 $3,070,000 18%$552,600 $552,600 <br />68 Pleasanton Canal Bridge Improvements Alamo Canal Trail to Pleasanton Canal <br />Change bridge railing to meet Caltrans <br />standards, 55" height $110,000 $110,000 18%$19,800 $19,800 <br />69 Chabot Canal <br />Owens Drive/Dublin-Pleasanton BART Station to W Las Positas <br />Boulevard/Arroyo Mocho Trail <br />10 foot paved bikeway <br />Compacted soil/decompressed granite side <br />path for pedestrian/runner/equestrian use <br />Intersection Improvements at W Las Positas, <br />Inglewood, Stoneridge, Gibraltar, Owens. <br />Requires bridge at Arroyo Mocho. Provides <br />between Arroyo Mocho Trail and Dublin- <br />Pleasanton BART, and Hart Middle School <br />(Constrain: multiple mid-block crossings) <br />$6,000,000 $6,000,000 18%$1,080,000 $1,080,000 <br />70 Iron Horse Trail Between Stoneridge Drive and Santa Rita Road <br />Iron Horse Trail, intersection/trail crossing and <br />signage improvements are needed; this area <br />includes the intersection of W Las Positas with <br />Stoneridge Drive and the Arroyo Mocho Trail <br />with the Iron Horse Trail Corridor; construct <br />bridge across Arroyo Mocho Trail <br />$2,360,000 $4,120,000 18%$424,800 $741,600 <br />71 Iron Horse Trail Busch Road to Stanley Boulevard <br />10 foot paved bikeway <br />Compacted soil/decompressed granite side <br />path for pedestrian/runner/equestrian use <br />from Busch Road, to Stanley Boulevard, at <br />Shadow Cliffs Regional Park Entrance. <br />Intersection/trail crossings improvements at <br />Busch Road and Valley/Stanley intersection, <br />and railroad crossing <br />$12,360,000 $12,360,000 18%$2,224,800 $2,224,800 <br />5 <br />Page 129 of 893