|
Low High Minimum Maximum
<br />#
<br />Estimated Cost ($2024)Cost Included in TIF Program
<br />Existing Deficiency?Percent Eligible for
<br />Fee ProgramRoadway Explanation of
<br />Eligibility
<br />Percent Pleasanton
<br />Trips, from Model
<br />Percent Pleasanton
<br />Trips, AdjustedImprovementsIntersection/Segment
<br />64 Val Vista Bridge Improvements Val Vista Community Park Trail & Arroyo de la Laguna
<br />Update bridge railing to meet Caltrans
<br />standards $140,000 $140,000 18%$25,200 $25,200
<br />65 Arroyo de la Laguna Arroyo Mocho to Arroyo del Valle
<br />East bank:
<br />10 foot paved bikeway
<br />Compacted soil/decompressed granite side
<br />path for pedestrian/runner/equestrian use
<br />$1,870,000 $2,990,000 18%$336,600 $538,200
<br />66 W Las Positas/Arroyo de la Laguna Trail Access Point Arroyo de la Laguna to W Las Positas
<br />Access gate and pathway from north side of
<br />W Las Positas Road $170,000 $170,000 18%$30,600 $30,600
<br />67 Arroyo de la Laguna Trail - South Extension Arroyo del Valle to near south end of Laguna Creek Lane
<br />10 foot paved bikeway
<br />Compacted soil/decompressed granite side
<br />path for pedestrian/runner/equestrian use
<br />Requires new bike/ped bridge at junction of
<br />Arroyo del Valle. Intersection improvements at
<br />Bernal Ave, Potential access points at
<br />Lylewood Drive, Bernal Avenue, and along
<br />Laguna Creek Lane
<br />$3,070,000 $3,070,000 18%$552,600 $552,600
<br />68 Pleasanton Canal Bridge Improvements Alamo Canal Trail to Pleasanton Canal
<br />Change bridge railing to meet Caltrans
<br />standards, 55" height $110,000 $110,000 18%$19,800 $19,800
<br />69 Chabot Canal
<br />Owens Drive/Dublin-Pleasanton BART Station to W Las Positas
<br />Boulevard/Arroyo Mocho Trail
<br />10 foot paved bikeway
<br />Compacted soil/decompressed granite side
<br />path for pedestrian/runner/equestrian use
<br />Intersection Improvements at W Las Positas,
<br />Inglewood, Stoneridge, Gibraltar, Owens.
<br />Requires bridge at Arroyo Mocho. Provides
<br />between Arroyo Mocho Trail and Dublin-
<br />Pleasanton BART, and Hart Middle School
<br />(Constrain: multiple mid-block crossings)
<br />$6,000,000 $6,000,000 18%$1,080,000 $1,080,000
<br />70 Iron Horse Trail Between Stoneridge Drive and Santa Rita Road
<br />Iron Horse Trail, intersection/trail crossing and
<br />signage improvements are needed; this area
<br />includes the intersection of W Las Positas with
<br />Stoneridge Drive and the Arroyo Mocho Trail
<br />with the Iron Horse Trail Corridor; construct
<br />bridge across Arroyo Mocho Trail
<br />$2,360,000 $4,120,000 18%$424,800 $741,600
<br />71 Iron Horse Trail Busch Road to Stanley Boulevard
<br />10 foot paved bikeway
<br />Compacted soil/decompressed granite side
<br />path for pedestrian/runner/equestrian use
<br />from Busch Road, to Stanley Boulevard, at
<br />Shadow Cliffs Regional Park Entrance.
<br />Intersection/trail crossings improvements at
<br />Busch Road and Valley/Stanley intersection,
<br />and railroad crossing
<br />$12,360,000 $12,360,000 18%$2,224,800 $2,224,800
<br />5
<br />Page 129 of 893
|