Laserfiche WebLink
Low High Minimum Maximum <br /># <br />Estimated Cost ($2024)Cost Included in TIF Program <br />Existing Deficiency?Percent Eligible for <br />Fee ProgramRoadway Explanation of <br />Eligibility <br />Percent Pleasanton <br />Trips, from Model <br />Percent Pleasanton <br />Trips, AdjustedImprovementsIntersection/Segment <br />86 Downtown - Downtown Bike Master Plan $230,000 $370,000 18%$41,400 $66,600 <br />87* West Las Positas Corridor Foothill to Fairlands <br />Pedestrian and bicycle improvements <br />identified in WLP Corridor plan $50,000,000 $50,000,000 No 23%$11,350,000 $11,350,000 <br />88* Stoneridge Mall Road Full loop Add sidewalk $510,000 $510,000 No 23%$115,770 $115,770 <br />89* Stoneridge Mall Road Full loop Add cycle track $3,780,000 $3,780,000 No 23%$858,060 $858,060 <br />90* Bernal Avenue Valley to Fire Station Add bike lane in the eastbound direction $110,000 $110,000 No 23%$24,970 $24,970 <br />91* Peters Avenue St. John to Old Bernal <br />Construct two-way cycle track on west side of <br />roadway $2,000,000 $2,000,000 No 23%$454,000 $454,000 <br />92* Safety Corridors Santa Rita, Stoneridge Hopyard Convert to protected intersections $6,600,000 $6,600,000 No 23%$1,498,200 $1,498,200 <br />93* Stanley Boulevard Valley to City Limit <br />Extend two-way cycle track / mixed use path <br />design from intersection to the mixed use <br />path that exists to the east of the BMX park <br />$880,000 $880,000 No 23%$199,760 $199,760 <br />94* Citywide Trails <br />Improve trail access by adding gates and <br />paths from existing sidewalks $400,000 $400,000 No 23%$90,800 $90,800 <br />$134,210,000 $193,840,000 $27,178,960 $37,912,360 <br />95 Citywide - <br />Expand the City's ITS equipment and <br />capabilities; update the City's Traffic <br />Operations Center Hardware (computers, <br />servers, switches, monitors, etc.); web <br />integration and information dissemination <br />project to provide information to public <br />through various media (i.e., web, mobile, <br />phone, etc.); includes 5 years of service <br />$950,000 $950,000 18%$171,000 $171,000 <br />96 Citywide - <br />Upgrade and update of approximately 70 <br />traffic controllers to allow for Ethernet <br />communications; upgrade system <br />communication to Ethernet and establish <br />communication to all signals; upgrade existing <br />controller software to the latest version <br />$1,620,000 $1,620,000 18%$291,600 $291,600 <br />97* Citywide - Update to the existing traffic model $500,000 $500,000 23%$113,500 $113,500 <br />$322,780,000 $391,300,000 $227,127,800 $245,242,400 <br />$98,665,000 $98,665,000 $48,590,060 $48,590,060 <br />$421,445,000 $489,965,000 $275,717,860 $293,832,460 <br />Note: New projects added in the 2024 TIF Update are marked with asterisk symbol (*). <br />Remaining Project TOTAL <br />New Projects TOTAL <br />OVERALL TOTAL (Remaining + New Projects) <br />SUBTOTAL, Bicycle Improvements <br />Citywide Projects <br />7 <br />Page 131 of 893