My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
121724
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 11:39:08 AM
Creation date
12/11/2024 11:13:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/17/2024
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />445 S Figueroa Street, Suite 1925 <br />Los Angeles, CA 90071 <br /> <br />www.raftelis.com <br /> <br /> <br />October 17, 2024 <br /> <br />Tamara Baptista <br />Deputy Director of Business Services, Operations Services Department <br />City of Pleasanton <br />P.O. Box 520 <br />Pleasanton, CA 94566 <br /> <br />Subject: Water and Wastewater Connection Fee Study <br /> <br />Dear Ms. Baptista, <br /> <br />Raftelis is pleased to provide this Water and Wastewater Connection Fee Study Report (Report) for the City of <br />Pleasanton (City). <br /> <br />The major objectives of the study include the following: <br />x Review the current connection fee structure and propose updates to reflect the current state of the water and <br />wastewater systems and future capital improvements as well as industry standards <br />x Provide subject matter expertise in the methodology used to calculate the proposed connection fee <br />schedules <br />x Confirm that proposed connection charges are fair to both future users and existing users who have <br />invested and reinvested in the water and wastewater systems <br /> <br />This Report summarizes the analyses, key assumptions, results, and proposed fees. <br /> <br />It has been a pleasure working with you, and we thank you and the City staff for their support during the study. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Brian Bass <br />Project Manager <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Page 150 of 893
The URL can be used to link to this page
Your browser does not support the video tag.