Laserfiche WebLink
2 <br /> <br /> <br /> <br /> <br />Callippe Preserve Golf Course Greenside Bunker Renovation Holes 10, 12, 13,15, 16, 18 <br />Item # Description of Item Estimated <br />Quantity Unit Unit Price Amount <br />1 Mobilization Cost 1 EA $ 8,200.00 $ 8,200.00 <br /> <br /> <br />2 <br />Removal of Bunker Sand, <br />Gravel & Drainpipe 12823 SF $ 1.80 $ 23,081.40 <br /> <br /> <br />3 <br />Turf Removal and Disposal <br />Offsite. Up to 4 ft around <br />perimeter. 8000 SF $ 1.25 $ 10,000.00 <br /> <br /> <br /> <br /> <br /> <br />4 <br />Better Billy Bunker <br />Construction (or equal) – <br />Including new drainpipe, <br />gravel, polymer, sand. Clean <br />and re-establish firm bunker <br />edge. <br /> <br /> <br />12823 <br /> <br /> <br />SF <br /> <br /> <br />$ 13.80 <br /> <br /> <br />$ 176,957.40 <br /> <br /> <br />5 <br />Soil preparation for turf <br />installation around perimeter <br />of bunkers 8000 SF $ 0.80 $ 6,400.00 <br /> <br /> <br />6 <br />Irrigation sub-surface drip <br />system per bunker. 11 EA $ 3,890.00 $ 42,790.00 <br /> <br /> <br /> <br /> <br />7 <br />Amendments, fertilizers, for <br />turf prep. Owner purchased <br />and Contractor to apply and <br />incorporate into soil. <br /> <br />8000 <br /> <br />SF <br /> <br />$ 0.40 <br /> <br />$ 3,200.00 <br /> <br /> <br />8 <br />Sod – Purchase, Delivery & <br />Installation 8000 SF $ 1.30 $ 10,400.00 <br />Total $ 281,028.80 <br /> <br /> <br />Contractor Name: _D.H.R. Construction, Inc. <br /> <br /> <br />SIGNATURE: _ <br /> <br /> <br /> <br />Joy Ramos - Vice President <br />Docusign Envelope ID: 06528EA8-C8FB-4176-8C2E-D53F24B897F0