My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
01-22
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 9:48:41 AM
Creation date
1/23/2025 9:44:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trail Name of Trail Trail Use <br />No. <br />1 "Existing Pedestrian/ <br />Vineyard Avenue bicycle/ <br />Alignment" Trail equestrian <br />2 "S"-Curve Trail Pedestrian/ <br />(mostly existing) Bicycle/ <br />Equestrian <br />3 Realigned Bicycle & <br />Vineyard Avenue Pedestrian/ <br />Bicycle Route and Bicycle/ <br />Multi-Use Trail Equestrian <br />4 East Plan Area Pedestrian/ <br />Trail Equestrian <br />5 West Plan Area Pedestrian/ <br />Trail Equestrian <br />6 Lot 3 Trail Pedestrian/ <br />Bicycle <br />7 Neighborhood Pedestrian/ <br />Trails Bicycle/ <br />Equestrian <br />Table V-2 <br />Trails Summary <br />Timing of Construction By <br />Construction <br />At the time Vineyard Plan Area <br />A venue is realigned developers <br />At the time Vineyard Plan Area <br />Avenue is realigned developers <br />At the time Vineyard City/Plan Area <br />A venue is realigned developers/ <br />Ruby Hill <br />Time of on-site Developer for <br />development and Lot 19 , and <br />connecting trail acquisition City /developer <br />for Lot 26 <br />Time of on-site City for Lo t 14 <br />development and and City/ <br />connecting trail acquisition developer for <br />Lot 22 <br />Time of Lot 3 Lot 3 developer <br />development <br />Time of on-site Developers <br />development <br />70 <br />Trail Width Trail Material <br />To be determined in Asphalt <br />accordance with <br />master landscape plan <br />To be determined in Asphalt <br />accordance with <br />master landscape plan <br />6-foot bicycle routes with Asphalt and <br />multi-use trail to be crushed rock <br />determined at the time <br />Vineyard Avenue <br />realignment d es ign occurs <br />2 to 6 feet depending Graded and <br />upo n terrain compacted-earth <br />2 to 6 feet depending Graded and <br />upo n terrain compacted-earth <br />16 feet (EV A) Asphalt <br />4-6 feet As pha lt and <br />graded and <br />compacted-earth
The URL can be used to link to this page
Your browser does not support the video tag.