My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
01-22
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 9:48:41 AM
Creation date
1/23/2025 9:44:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public access through Lot 22 should be accomplished upon completion of all of the <br />following : (1) subdivision of Lot 22 , (2) completion of the community park trail , and <br />(3) acquisition of connecting trail links to the south needed to complete a loop trail <br />system . <br />6. Lot 3 Trail <br />An asphalt paved EV A/trail is planned to connect a future cul-de-sac street on Lot 3 with <br />Montevino Drive . The trail connection will be used for pedestrians and bicyclists. <br />7. Nei2hborhood Trails <br />In conjunction with the above public trails , additional smaller public and private trails <br />should be planned on a project-by-project basis to connect individual developments to this <br />basic trail network, thus creating a well-integrated neighborhood system. <br />8. <br />Signage shall be posted along all public trails to provide clear direction, specify no <br />trespassing on private property, and require that pets be leashed. <br />72
The URL can be used to link to this page
Your browser does not support the video tag.