My WebLink
|
Help
|
About
|
Sign Out
AGENDA FULL PACKET
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
01-22
>
AGENDA FULL PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2025 9:48:41 AM
Creation date
1/23/2025 9:44:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/22/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEGEND <br />-Existing Sewer Line <br />--Proposed Sewer Line <br />• • • Proposed Force Main <br />• Proposed Sewer Pump Station <br />PHASE -I <br />Sewer Master Plan Section-I <br />Trunk Line <br />Sewer Master Plan Sectlon-2 <br />Replacement Line <br />Tioga Ct. to Vineyard Ave. <br />Trunk Line <br />" <br />@ <br />® <br />© <br />® Foxbrough Pl. to Vineyard Ave. Connecting Line <br />PHASES -2/3 <br />® Trunk Line, Force Main and Pump Station <br />® Ruby Hill Reimbursement <br />!FIGURE VIII -21 <br />K <br />I <br />SCALE: 1 " -800' <br />SEWER SYSTEM COST COMPONENTS AND PHASING <br />98
The URL can be used to link to this page
Your browser does not support the video tag.