Laserfiche WebLink
P24-0720, 0 Vineyard Ave Planning Commission <br />3 of 7 <br />BACKGROUND <br />The Vineyard Avenue Corridor Specific Plan (VACSP) was adopted on June 1, 1999. The <br />VACSP anticipated and designated this site as the location for a future Elementary School, <br />and the subject site was subsequently dedicated to the Pleasanton Unified School District <br />(PUSD) for this purpose. Since the adoption of the VACSP, based on changing needs and <br />priorities, PUSD has determined the location is no longer needed or beneficial to retain as a <br />future school site. <br /> <br />The School District, therefore, proposed the site as a potential housing opportunity site during <br />the City’s site selection process for the Housing Element Update; the City ultimately included <br />the site in the 2023-2031 6th Cycle Housing Element for development of up to 28 housing units. <br />When the elementary school was considered in the VACSP, it was envisioned that the <br />development would include school buildings, as well as a sports/playfield open to the public on <br />a portion of the site. As such, as part of the Housing Element adoption, Policy 11 was included <br />in the General Plan Land Use Element which for Site 27 states: “this site shall include a <br />neighborhood park or open space adjacent to Vineyard Avenue, of at least three acres.” This <br />policy was intended to ensure that a portion of the site was reserved for open space or park <br />uses, which could include recreation opportunities for residents of the Vineyard Avenue area, <br />as well as allow for an open space buffer to maintain continuity of character with the adjacent <br />properties along Vineyard Avenue. <br /> <br />In May 2024, Trumark Homes submitted an SB330 Housing Site Compliance Review <br />application. This application complies with the zoning and General Plan requirements and <br />provides a single approximately 3-acre park/open space directly abutting Vineyard Avenue <br />(see Figure 2). Staff is currently processing this zoning and General Plan-compliant project <br />and, pursuant to the approval procedures for Housing Element sites, anticipates conducting a <br />Zoning Administrator hearing in early February and bringing the Vesting Tentative Map to the <br />Planning Commission in late February. <br /> <br />Figure 2: Single Park Project <br /> <br />