My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
020425 REGULAR
>
CITY COUNCIL AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:56:20 AM
Creation date
1/31/2025 2:19:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2025
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2290 <br />Page 17 of 34 <br /> <br /> <br />51. LEAD REMEDIATION: The applicant-submitted Phase 1 Environmental Site <br />Assessment report by Ramboll US Consulting includes the following finding: “Results <br />from soil sampling conducted by Ramboll in September and October 2020 identified <br />concentrations of lead in shallow soil above regulatory screening criterion for <br />residential land use…” This finding identifies a Recognized Environmental Concern. <br />Elevated lead shall be remediated by the applicant according to governing <br />regulations prior to any site disturbance, with evidence of said remediation submitted <br />to the City of Pleasanton. (Address this condition prior to issuance of Building Permit <br />for grading, demolition, or Building Construction, whichever occurs first). Project <br />Specific Condition. <br /> <br />52. CORROSIVE SOILS: According to the Geotechnical Study by Geo-Logic Associates, <br />collected soil samples have been classified as moderately corrosive. As such, all <br />buried iron, steel, cast iron, ductile iron, galvanized steel and dielectric coated street or <br />iron shall be properly protected against corrosion depending on the critical nature of <br />the structure. Project Specific Condition. <br /> <br />53. CREEK SETBACK: Site improvements that abut or are within close proximity to the <br />top of the creek bank at Arroyo del Valle are subject to Pleasanton Municipal Code <br />§9.14.090(B)(3) “Watercourse Protection” which reads, “Prohibited Acts. No person <br />shall commit or cause to be committed any of the following acts, unless a written <br />permit has first been obtained from the operations services director: Carry out <br />development within 20 feet of the top of a bank.” <br /> <br />The Municipal Code allows City staff to consider designs that violate code standards if <br />compelling technical information is presented by a recognized expert. For this <br />application, the applicant submitted a site-specific Geotechnical Investigation report by <br />Geo-Logic Associates that addresses creek bank stability and liquefaction. The following <br />report recommendations must be incorporated into the site design: <br /> <br />Stitch piers shall be installed along the top of the existing creek bank. Stitch piers shall <br />consist of drilled, cast-in-place, reinforced concrete piers. Minimum pier diameter shall <br />be 24 inches. Center-to-center spacing between piers shall be no more than two times <br />the pier diameter. The upper portion of the stitch piers above the toe of creek bank <br />elevation shall be designed to retain the soil and surcharge forces behind the piers. <br />Resistance to vertical and lateral loads shall be from the lower portion of the piers <br />below the toe of creek elevation. Project Specific Condition. <br /> <br />54. ACCESS TO CREEK: Lot D shall allow access to the creek for maintenance <br />personnel. A locked gate shall be provided to prevent entry by unauthorized <br />residents or the public. Project Specific Condition. <br /> <br />55. CREEK BANK MAINTENANCE: The applicant or future homeowners association shall <br />maintain the creek bank within the boundary of Tract 8631 adjacent to the Arroyo del <br />Valle in accordance with Zone 7 Water Agency standards. <br />56. SANITARY SEWER BACKUPS: The plumbing fixtures proposed within the <br />basements will be subject to back-up if an obstruction occurs in the City’s mainline <br />sewer within Saint John Street. The basements shall therefore be serviced by a <br />Page 32 of 350
The URL can be used to link to this page
Your browser does not support the video tag.