Laserfiche WebLink
Ordinance No. 2290 <br />Page 33 of 34 <br /> <br /> <br />127. RECYCLED WATER: Recycled water should be used on site during the grading and <br />construction period. However, under any declared stage of water shortage, recycled <br />water must be used throughout the grading and construction period. <br />128. RECYCLED WATER USE REQUIREMENT: If the site is within the city’s recycled <br />water service area (recycled water distribution system is along route to the proposed <br />application), the irrigation system must be designed in accordance with the City’s <br />Recycled Water Use Guidelines and Recycled Water Irrigation Standards, per PMC <br />Section 14.06. Refer to PMC Section 14.20 for a list of exceptions. <br /> <br />129. RECYCLED WATER USE PERMIT: The applicant shall submit a Recycled Water <br />Use Permit application and package (as outlined in the City’s Recycled Water Use <br />Guidelines available online), to the Recycled Water Program (925- 931-5513). The <br />Recycled Water Use Permit application and package shall be submitted concurrently <br />with the building permit submittal, and shall be conditionally approved by the <br />Recycled Water Program prior to building permit issuance. Final approval by the <br />Recycled Water Program is required before the start of recycled water service. Refer <br />to PMC Section 14.06 for the regulations of recycled water use. <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />130. BICYCLE RACKS: All bicycle racks shall comply with the following criteria: <br />a. Located in a visible and accessible location; <br />b. Support the frame of the bicycle and not just one wheel; <br />c. Allow the frame and one wheel to be locked to the rack; <br />d. Allow the use of either a cable or U-shaped lock; <br />e. Be securely anchored; <br />f. Be usable by bikes with no kickstand; and <br />g. Be usable by a wide variety of bicycle sizes and types. <br /> <br />The number, location and type of bicycle racks shall be shown on the building permit <br />plans and shall be subject to review and approval by the City Traffic Engineer prior to <br />issuance of building permits. <br /> <br />Traffic Control <br /> <br />131. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP <br />shall have proper lane closure procedures such as flagger stations, signage, cones, <br />and other warning devices implemented during construction. The TCP shall also <br />include time of day/hours of lane closures and total number of days. <br />Page 48 of 350