My WebLink
|
Help
|
About
|
Sign Out
APPENDICES
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
AGENDA PACKETS
>
2025
>
APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2025 10:21:11 AM
Creation date
2/6/2025 3:42:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/13/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Introduction <br />The International Society of Arboriculture (ISA) developed a specialized Tree Risk Assessment Qualification <br />(TRAQ), training arborists to effectively assess tree risk using a systematic and documented process. TRAQ <br />arborists are equipped to systematically assess tree health, structural integrity, likelihood of tree failure, <br />time frame in which failure may occur, likelihood of impact to target (e.g., people, home, car), and severity <br />of impact should it occur. TRAQ arborists are trained to consider solutions to mitigate tree risk prior to <br />considering removal as a recommendation. <br />Tree risk management begins with the tree owner establishing an acceptable level of risk (ISA 2017) and <br />identifying the appropriate level of assessment to determine the risk of individual trees. Three levels of risk <br />assessment exist in the ISA TRAQ program which vary in detail and equipment used to complete the <br />assessment: level 1 limited visual assessment, level 2 basic assessment, and level 3 advanced <br />assessment (shown in the table below). Municipalities often utilize all levels of assessment throughout the <br />City to balance risk assessment programs with responsible use of public funds. A level 1 assessment is <br />often used to first identify trees that are high risk. Once high-risk trees or areas of concern are identified, a <br />level 2 assessment occurs for individual trees and mitigation follows, A level 3 assessment is typically <br />reserved for trees of significance, protected trees, or large mature trees that provide value to the community <br />with costly replacement. Effective risk management depends on tree risk assessments being conducted on <br />a regular basis, occurring every 3-5 years as tree risk conditions may develop as trees continue to mature. <br />By utilizing these three assessment levels, the City can manage tree risk prior to failure and retain trees <br />where risk can be mitigated. <br />ISA Risk Assessment Levels <br />Risk Assessment <br />Level Description <br />Level 1 ‘Windshield’ survey to identify high risk trees while driving or walking. Only <br />major defects or concerns are observed and recorded. <br />Level 2 <br />360-degree observation of the crown, limbs, and trunk. <br />Determination of targets (homes, people, cars) that may be impacted by tree <br />or limb failure. <br />Level of damage to the target should impact occur. <br />Level 3 Advanced assessments of the roots, stem, or crown. <br />Analyze internal aspects of trees using sophisticated tools and technology. <br />
The URL can be used to link to this page
Your browser does not support the video tag.