Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Introduction <br />Construction for development, maintenance, and renovation can pose threats to tree survivability in <br />numerous ways. Threats include injury to roots, trunks, and branches; soil compaction; soil contamination; <br />and improper pruning. Including an arborist in the planning stages of construction helps avoid damage <br />when trees intersect with the built environment. Arborists identify which trees will be retained or removed, <br />create site-specific tree protection protocols, and establish areas where replacement trees will be planted. <br />Pleasanton’s Municipal Code (§17.16.070) provides guidelines for the mandatory tree protections during <br />construction. Further detail for tree protection requirements may have significant benefits on the urban <br />forest, as described below: <br />1.Tree Protection Zones: A Tree Protection Zone (TPZ) is an area surrounding a tree and its critical <br />root zone where no grading, excavation, construction activity, equipment storing, or vehicle <br />parking is to occur. The purpose of the TPZ is to protect all parts of the tree, both above and below <br />ground. The size of TPZ ranges between tree owners; however, research suggests that a TPZ <br />should be at least 1.5 inches wide per every inch DSH (Day et al. 2010). A successful TPZ is <br />surrounded by signed fencing that reads “Keep Out: Tree Protection Zone.” <br />2.Reducing Compaction: When soil is compacted, water and oxygen available to tree roots is <br />limited, leading to detrimental issues for a tree. In construction areas, compaction occurs <br />purposefully through mechanical compaction or incidentally through the passage of vehicles and <br />construction equipment over soil containing a tree’s roots. <br />3.Minimizing Effects of Grade Changes: The optimal zone for root growth is within the first 12 <br />inches of soil depth. Any change in grade within a tree’s rooting zone will likely cause negative <br />impacts for tree health. The degree to which these impacts affect the tree depends on the age of <br />the tree, species, prior stressors, and environmental factors. <br />4.Inspection: Trees impacted during construction, maintenance, or renovations, should be <br />monitored for decline annually by an ISA Certified Arborist for the first 5 years after construction. <br />Monitoring should include photographs, annual reports, and mitigation techniques if necessary.