My WebLink
|
Help
|
About
|
Sign Out
RES 2025008
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2025
>
RES 2025008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 12:04:18 PM
Creation date
3/4/2025 11:59:18 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/18/2025
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. GROWTH MANAGEMENT PROGRAM COMPLIANCE <br />All residential development within the Specific Plan Area shall be subject to growth management <br />approval in accordance with the City's Growth Management Ordinance. <br />E. ALAMEDA COUNTY GENERAL PLAN <br />Three Alameda County General Plan policies and one goal relate directly to the Specific Plan. <br />These call for the protection of the County agricultural and quarry lands lying beyond the <br />Specific Plan Area, and read as follows: <br />Policy 77: The County shall require buffers between those areas designated for <br />agricultural use and new non-agricultural uses within agricultural areas or abutting <br />lots. The size, configuration, and design of buffers shall be determined based on <br />the characteristics of the project site and the intensity of the adjacent agricultural <br />uses, and if applicable, the anticipated timing of future urbanization of adjacent <br />agricultural land where such agricultural land is included in a phased growth plan. <br />The buffer shall be located on the lot for which a permit is sought and shall <br />provide for the protection of the maximum amount of arable, pasture, and grazing <br />land feasible. <br />Policy 78: The County shall require that, where conflicts between a new use and <br />existing use are anticipated, the burden of mitigating the conflicts be the <br />responsibility of the new use. <br />Policy 79: The County shall enforce the provisions of the Alameda County <br />Right-to-Farm Ordinance on all lands within and adjacent to agricultural areas. <br />Goal (Quarries and Regionally Significant Aggregate Resource Areas): To recognize the <br />regional value of the County's construction aggregate resources and to ensure <br />compatibility between quarry operations and surrounding land uses. <br />F. UNITED STATES ARMY CORPS OF ENGINEERS <br />The United States Army Corps of Engineers (Corps) may assert jurisdiction for drainage, bridge, <br />and road improvements within the Specific Plan Area under the authority of Section 404 of the <br />Clean Water Act. The Corps' jurisdiction over non-tidal waters extends to the "ordinary high <br />water mark" of creeks, streams, and rivers, plus possible adjacent wetland areas. Wetlands are <br />defined for regulatory purposes as "those areas that are inundated or saturated by surface or <br />groundwater at a frequency and duration sufficient to support, and that under normal <br />circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil <br />conditions." Wetlands generally include swamps, marshes, bogs, and similar areas. <br />119
The URL can be used to link to this page
Your browser does not support the video tag.